▮▮Coloprice
← Georgia

7 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Tbilisi: 7 facilities, colocation pricing

Colocation pricing and providers in Tbilisi →

How many data centers are in Tbilisi?

Coloprice tracks 7 data centers in Tbilisi, Georgia: 6 operational, 1 under construction and 0 announced, run by 7 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.106

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 1 AI-ready · 2+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Tbilisi, Georgia· · ·$0.1067—
Azerbaijan· · ·$0.06214—
Armenia· · ·$0.1227—
Ukraine· · ·$0.18532—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Tbilisi?

Coloprice tracks 7 data centers in Tbilisi, Georgia: 6 operational, 1 under construction and 0 announced, run by 7 operators.

Which operators run data centers in Tbilisi?

By number of facilities tracked: Silk Cloud (Silknet) (1), Cloud9 (1), Caucasus Online (NEQSOL Holding) (1), NewTelco Georgia Ltd. (1), G Data (1).

What is the total data center power capacity in Tbilisi?

Facilities that publish capacity add up to 2 MW (1 of 7 sites disclose a figure); the largest published site is Silk Cloud Tbilisi Data Center with 2 MW.

How much does colocation cost in Tbilisi, Georgia?

No published wholesale $/kW benchmark exists for Tbilisi, Georgia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 7 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Tbilisi, Georgia?

Commercial electricity in Tbilisi, Georgia is $0.106 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 7 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Tbilisi, Georgia?

On power alone, Azerbaijan ($0.062/kWh) run below Tbilisi, Georgia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Tbilisi, Georgia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
Silk Cloud Tbilisi Data CenterSilk Cloud (Silknet)2—Under construction
Cloud9 Tbilisi Data CenterCloud9—III*Operational
Caucasus Online Data CenterCaucasus Online (NEQSOL Holding)——Operational
NewTelco Georgia Data CenterNewTelco Georgia Ltd.——Operational
G Data Data-Center #1G Data—IIIOperational
TBC TBL-01JSC TBC Bank—IIIOperational
JSC Bank of Georgia Main DC LiloJSC Bank of Georgia—IIIOperational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Georgia