▮▮Coloprice

CyrusOne FRA7

Under construction

CyrusOne FRA7 is a data center in Frankfurt, Germany, operated by CyrusOne, with 81 MW of published IT capacity, currently under construction.

81 MW data center under construction at the FRANKFURT WESTSIDE regeneration site, with first 9 MW phase due in Q2 2026 and one of Europe's largest waste-heat reuse projects.

CyrusOne FRA7 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction

8 of 14 fields published · Operator? Add or correct data →

Units
Operator
CyrusOne
City
Frankfurt, Germany
Power, MW
81 MW
Cooling
Air
Floor space
25,266 m²
Renewable energy
100%
Market benchmark
$250 per kW per month wholesale · Frankfurt, Germany
Index rate for the market, not this operator’s price list
Address
Stroofstrasse 49, 65933 Frankfurt am Main (Griesheim) · Open in maps ↗

2 sources · data pending on-site verification

E

Coloprice Score

26 out of 100

Class E · #69 of 274 in Germany

  • Resilience0/35
  • Compliance0/20
  • Transparency12/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
CyrusOne FRA7 — Coloprice Score 26
<a href="https://coloprice.com/data-centers/germany/frankfurt/cyrusone-fra7-frankfurt-westside/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/cyrusone-fra7-frankfurt-westside.svg"
    alt="CyrusOne FRA7 — Coloprice Score 26" height="64">
</a>

FRA7 anchors the FRANKFURT WESTSIDE mixed-use regeneration project in Griesheim, where CyrusOne is turning a former industrial site at Stroofstrasse 49 into an 81 MW campus — with the first 9 MW phase due in Q2 2026. Two separate three-story buildings will offer 25,266 sqm of technical space, powered by a 150 MVA utility supply at 110 kV through a dedicated substation with a redundant grid connection. The headline feature is heat: up to 40 MW of waste heat can be exported to warm the surrounding campus, making this one of Europe's largest data center heat-reuse projects. Cooling uses free-cooling technology with closed-loop water systems to hold down both PUE and WUE. Sustainability commitments include 100% renewable power, a BREEAM "Very Good" target, DGNB Platinum pre-assessment and a Zero Waste to Landfill program, with 5,500 sqm of green space planned. Four diverse fibre routes make it a fit for hyperscale and large enterprise deployments.

  • ▮81 MW campus under construction; first 9 MW phase due Q2 2026
  • ▮Up to 40 MW waste-heat export — among Europe's largest heat-reuse projects
  • ▮25,266 sqm of technical space in two three-story buildings
  • ▮150 MVA utility supply at 110 kV via dedicated substation
  • ▮BREEAM Very Good target and DGNB Platinum pre-assessment

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Frankfurt

FacilityOperatorPower, MWTierStatus
CyrusOne FRA7CyrusOne81—Under construction
Colt DCS Frankfurt 3 Data CentreColt DCS32.4—Under construction
Colt DCS Frankfurt City Data CentreColt DCS——Operational
CyrusOne FRA3CyrusOne22—Operational
Digital Realty FRA11Digital Realty——Operational
Digital Realty FRA15Digital Realty——Operational

Source — Verified against operator sources · data pending on-site verification