How many data centers are in Nuremberg?

Coloprice tracks 7 data centers in Nuremberg, Germany: 7 operational, 0 under construction and 0 announced, run by 7 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.269

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 6+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Nuremberg, Germany· · ·$0.2697—
Netherlands$180$0.179130—
United Kingdom$213$0.454196—
France$190$0.173186—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Nuremberg?

Coloprice tracks 7 data centers in Nuremberg, Germany: 7 operational, 0 under construction and 0 announced, run by 7 operators.

Which operators run data centers in Nuremberg?

By number of facilities tracked: NorthC (1), Hetzner Online (1), noris network AG (1), Treureal Property Management (1), Core-Backbone (1).

What is the total data center power capacity in Nuremberg?

Facilities that publish capacity add up to 6 MW (1 of 7 sites disclose a figure); the largest published site is NorthC Nuremberg with 6 MW.

How much does colocation cost in Nuremberg, Germany?

No published wholesale $/kW benchmark exists for Nuremberg, Germany yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 7 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Nuremberg, Germany?

Commercial electricity in Nuremberg, Germany is $0.269 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 7 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Nuremberg, Germany?

On power alone, Netherlands ($0.179/kWh), France ($0.173/kWh) run below Nuremberg, Germany. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Nuremberg, Germany market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
NorthC NurembergNorthC6—Operational
Hetzner Data Center Park NurembergHetzner Online——Operational
noris network Nürnberg Südnoris network AG——Operational
DeutschherrnkarreeTreureal Property Management——Operational
Core-Backbone NBG1Core-Backbone——Operational
euNetworks Colocation NuernbergeuNetworks Group——Operational
nLighten Nuremberg NUE1nLighten——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.