Data centers in Hamburg: 2 facilities, colocation pricing

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.283

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 2+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Hamburg, Germany· · ·$0.2832
Netherlands· · ·$0.22051
United Kingdom· · ·$0.44281
France· · ·$0.18553

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How much does colocation cost in Hamburg, Germany?

No published wholesale $/kW benchmark exists for Hamburg, Germany yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Hamburg, Germany?

Commercial electricity in Hamburg, Germany is $0.283 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Hamburg, Germany?

On power alone, Netherlands ($0.220/kWh), France ($0.185/kWh) run below Hamburg, Germany. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Hamburg, Germany market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
NTT Hamburg 1 Data CenterNTT Global Data Centers0.8Operational
NorthC HamburgNorthC1.17Operational