1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Rosbach vor der Höhe: 1 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.283
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 24+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Rosbach vor der Höhe, Germany | · · · | $0.283 | 1 | — |
| Netherlands | · · · | $0.220 | 51 | — |
| United Kingdom | · · · | $0.442 | 81 | — |
| France | · · · | $0.185 | 53 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Rosbach vor der Höhe, Germany?
No published wholesale $/kW benchmark exists for Rosbach vor der Höhe, Germany yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Rosbach vor der Höhe, Germany?
Commercial electricity in Rosbach vor der Höhe, Germany is $0.283 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Rosbach vor der Höhe, Germany?
On power alone, Netherlands ($0.220/kWh), France ($0.185/kWh) run below Rosbach vor der Höhe, Germany. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Rosbach vor der Höhe, Germany market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| firstcolo FRA7 | firstcolo | 24 | — | Announced |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Germany