▮▮Coloprice

CapitaLand Data Centre Navi Mumbai 1

Operational

Digha Naka, Dighe, Airoli, Navi Mumbai, Maharashtra 400708

CapitaLand Data Centre Navi Mumbai 1 is a data center in Navi Mumbai, India, operated by CapitaLand India Trust, with 108 MW of published IT capacity, currently operational.

CapitaLand India Trust's first Indian data center, a 108 MW carrier-neutral facility in Airoli, Navi Mumbai, formally opened in August 2025 as the first of four planned CLINT greenfield campuses in India.

CapitaLand Data Centre Navi Mumbai 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
CapitaLand India Trust
City
Navi Mumbai, India
Power, MW
108 MW
Cooling
Air
Floor space
30,193 m²
E

Coloprice Score

27 out of 100

Class E · #41 of 140 in India

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale11/15
  • Maturity7/10
How the score is calculated →
Embed score badge
CapitaLand Data Centre Navi Mumbai 1 — Coloprice Score 27
<a href="https://coloprice.com/data-centers/india/navi-mumbai/capitaland-navi-mumbai-1/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/capitaland-navi-mumbai-1.svg"
    alt="CapitaLand Data Centre Navi Mumbai 1 — Coloprice Score 27" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

CapitaLand Data Centre Navi Mumbai 1 — Top 10 data centers in Navi Mumbai, India 2026
#7 of 21 · See the list →

CapitaLand Data Centre Navi Mumbai 1 is the first data center CapitaLand India Trust (CLINT) brought into service in the country, on a site at Digha Naka, Dighe, in Airoli, Navi Mumbai. CLINT publishes a power capacity of 108 MW for the building and describes it as carrier-neutral, citing more than ten submarine cable landing stations in the greater Mumbai area as a low-latency draw for hyperscale and enterprise tenants. The facility was designed with a high floor-loading capacity to support dense rack deployments and flexible hard-floor or raised-floor fit-outs, and CLINT is targeting LEED Gold certification with high-efficiency chillers, water economization, intelligent energy management and solar panels rather than claiming the certification outright. The data center was formally completed and opened in a ceremony on 12 August 2025 attended by Singapore's Deputy Prime Minister Gan Kim Yong and Maharashtra Chief Minister Devendra Fadnavis, who described it as the first of four greenfield CLINT data center projects across Mumbai, Chennai, Hyderabad and Bangalore with a combined planned capacity of 244 MW. It anchors CLINT's entry into the Indian digital infrastructure market as the trust's flagship completed asset in the country.

  • 108 MW power capacity, CLINT's first completed India data center
  • Formally opened 12 August 2025 with Singapore DPM and Maharashtra CM attending
  • Carrier-neutral site near 10+ submarine cable landing stations
  • LEED Gold certification targeted, not yet awarded
  • First of four planned CLINT campuses in Mumbai, Chennai, Hyderabad, Bangalore (244 MW combined)

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Navi Mumbai

Source — Verified against operator sources · data pending on-site verification