CapitaLand Data Centre Navi Mumbai Tower 2
Under constructionCapitaLand Data Centre Navi Mumbai Tower 2 is a data center in Navi Mumbai, India, operated by CapitaLand India Trust, with 55 MW of published IT capacity, currently under construction.
Second tower on CLINT's Airoli campus, a 55 MW gross / 37 MW IT-load liquid-cooled facility under construction with two hyperscaler pre-leases already signed.

- Operator
- CapitaLand India Trust
- City
- Navi Mumbai, India
- Power, MW
- 55 MW
- Cooling
- Liquid
- AI-ready
- Yes
Coloprice Score
22 out of 100
limited data · #74 of 140 in India
- Resilience0/35
- Compliance0/20
- Transparency4/20
- Scale15/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Tower 2 is the second building on CapitaLand India Trust's Airoli campus in Navi Mumbai, next to the already-operational Tower 1. CLINT describes it as a 'hyper dense' facility with a planned IT load of 37 MW and gross power capacity of 55 MW, calling it one of the largest single-tower liquid-cooling implementations in the region and citing one of the best design power usage effectiveness figures achieved for a single data center tower in its portfolio. As of January 2026, CLINT had signed a second long-term hyperscaler pre-lease for the tower, part of a trust-wide milestone of pre-leasing 53% of gross power capacity across its three data centers then under development in Navi Mumbai, Hyderabad and Chennai. The tower is scheduled for completion in the fourth quarter of 2026, with progressive tenant handover through the first half of 2027. Together with the completed Tower 1, it expands CLINT's Airoli site into a multi-building campus aimed at hyperscale AI and cloud tenants that need high-density, liquid-cooled capacity in India's largest data center metro.
- ▮55 MW gross power capacity, 37 MW planned IT load
- ▮One of the region's largest single-tower liquid-cooling deployments
- ▮Two hyperscaler pre-lease agreements signed as of January 2026
- ▮Completion targeted 4Q 2026, tenant handover through 1H 2027
- ▮Second tower on CLINT's Airoli, Navi Mumbai campus alongside Tower 1
Colocation pricing: India & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Navi Mumbai
Source — Verified against operator sources · data pending on-site verification