MC Digital Realty KIX15
Under constructionMC Digital Realty KIX15 is a data center in Osaka (Ibaraki), Japan, operated by MC Digital Realty, with 24 MW of published IT capacity, currently under construction.
24 MW base-isolated data center under construction on the KIX Campus in Ibaraki, Osaka Prefecture, developed by the Digital Realty–Mitsubishi joint venture with hybrid air and liquid cooling and opening targeted for Q4 2028.

- Operator
- MC Digital Realty
- City
- Osaka (Ibaraki), Japan
- Power, MW
- 24 MW
- Cooling
- Liquid
- Floor space
- 17,672 m²
- AI-ready
- Yes
- Market benchmark
- $280 per kW per month wholesale · Japan
- Index rate for the market, not this operator’s price list
2 sources · data pending on-site verification
Coloprice Score
25 out of 100
limited data · #44 of 133 in Japan
- Resilience0/35
- Compliance0/20
- Transparency7/20
- Scale15/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
KIX15 is the next building on the KIX Campus in Ibaraki City, the Osaka-area site where MC Digital Realty, the 50/50 joint venture of Digital Realty and Mitsubishi Corporation, already runs several data centers. Construction was announced on 7 October 2026, with a 24 MW critical IT capacity and opening targeted for the fourth quarter of 2028. Japanese trade reporting describes a base-isolated structure with one basement level and three floors above ground, about 17,700 square metres of floor area, and a design that supports both air and liquid cooling for dense AI hardware. The joint venture positions the building within its Kansai AI Infrastructure Co-Creation Project, and says it will take the venture's Japan portfolio to ten data centers and roughly 220 MW of IT capacity. Seismic isolation is a standard requirement for large Japanese facilities, and Osaka has become the main second market to Tokyo for hyperscale and AI demand, which explains the steady cadence of new buildings on this campus. No tenant or certification has been published for KIX15.
- ▮24 MW critical IT capacity, opening targeted Q4 2028
- ▮Base-isolated structure: one basement and three floors, about 17,700 sqm
- ▮Hybrid air and liquid cooling for AI workloads
- ▮Part of the Kansai AI Infrastructure Co-Creation Project
- ▮Brings the MC Digital Realty Japan portfolio to about 220 MW
Colocation pricing: Japan & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Osaka (Ibaraki): free, reply within one business day
Get Quotes →Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Osaka (Ibaraki)
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| MC Digital Realty KIX15 | MC Digital Realty | 24 | — | Under construction |
| NTT Osaka OSK12 Data Center | NTT Global Data Centers | 36 | — | Under construction |
| Equinix OS3 | Equinix | — | — | Operational |
| Equinix OS1 | Equinix | — | — | Operational |
| Equinix OS2x | Equinix | — | — | Operational |
| Vantage Osaka Campus (KIX1) | Vantage Data Centers | 68 | — | Under construction |
Source — Verified against operator sources · data pending on-site verification