Ada Infrastructure Tokyo East 1 (TKE1) is a data center in Tokyo (East), Japan, operated by Ada Infrastructure, with 67 MW of published IT capacity, currently under construction.

67 MW, three-building campus from Ada Infrastructure sited in one of Tokyo's four major data center clusters, with the first data hall in Building 1 targeted for mid-2027.

Ada Infrastructure Tokyo East 1 (TKE1) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Ada Infrastructure
City
Tokyo (East), Japan
Power, MW
67 MW
Cooling
Air

Coloprice Score

18 out of 100

limited data · #57 of 76 in Japan

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Ada Infrastructure Tokyo East 1 (TKE1) — Coloprice Score 18
<a href="https://coloprice.com/data-centers/japan/tokyo/ada-infrastructure-tke1-tokyo/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/ada-infrastructure-tke1-tokyo.svg"
    alt="Ada Infrastructure Tokyo East 1 (TKE1) — Coloprice Score 18" height="64">
</a>

Tokyo East 1 is one of two campuses Ada Infrastructure is developing on Tokyo's east side, sited in one of the metro area's four established data center clusters with carrier-neutral connectivity through four or more diverse entry vaults. The campus is planned as three buildings for a total of 67 MW of IT load, with Building 1 split into 2.56 MW data halls; the first hall is scheduled to be customer-ready in mid-2027. Cooling is delivered through a closed-loop, air-cooled chiller plant feeding fan-coil walls in each data hall, with buffer tanks for the chilled-water loop and zero water used for evaporative heat rejection (WUE=0). The operator targets an annualized design PUE of 1.35–1.37, with N+1 UPS redundancy and N+1 gas turbine generation for backup power. Security is built around 24/7 on-site personnel, anti-climb perimeter fencing, biometric multi-factor access controls and international certifications including ISO 27001 and SOC 2, reflecting the enterprise and hyperscale tenant base the campus is designed to serve.

  • 67 MW campus across three buildings; Building 1 split into 2.56 MW data halls
  • First data hall in Building 1 targeted customer-ready mid-2027
  • Designed PUE 1.35–1.37 (annualized), WUE=0, N+1 gas turbine backup generation
  • ISO 27001 and SOC 2 security certifications
  • Carrier-neutral with 4+ diverse entry vaults to the site

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Tokyo (East)

Source — Verified against operator sources · data pending on-site verification