AirTrunk TOK1 Tokyo East
OperationalAirTrunk TOK1 Tokyo East is a data center in Tokyo (Inzai), Japan, operated by AirTrunk, with 300 MW of published IT capacity, currently operational, opened in 2021.
Japan's largest hyperscale campus, opened November 2021 in Inzai, Chiba, scaling to 300+ MW across seven buildings with a design PUE of 1.15 and marketed for cloud and AI workloads.

- Operator
- AirTrunk
- City
- Tokyo (Inzai), Japan
- Power, MW
- 300 MW
- Cooling
- Air
- Opened
- 2021
- Floor space
- 80,000 m²
- AI-ready
- Yes
Coloprice Score
32 out of 100
Class E · #26 of 76 in Japan
- Resilience0/35
- Compliance0/20
- Transparency9/20
- Scale13/15
- Maturity10/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
With more than 300 MW of planned capacity, TOK1 is Japan's largest hyperscale data center campus by power. AirTrunk opened the first phase in November 2021 after a 45-week build in Inzai, Chiba Prefecture, the cluster east of Tokyo favored by cloud operators for its stable bedrock and dense fiber routes. The 13.25-hectare site will ultimately hold seven buildings containing 102 data halls and roughly 80,000 square meters of technical space, supplemented by 9,600 square meters of office and storage area. Power arrives via dedicated onsite 66 kV substations, and the campus is engineered to a design PUE of 1.15, with provision for about 4,000 square meters of rooftop solar panels generating close to one million kWh annually. Capacity is delivered in large contiguous blocks aimed squarely at hyperscale cloud and AI platforms rather than retail colocation, though the campus remains carrier neutral with multiple diverse network entry paths and availability backed by service-level guarantees. TOK1 anchors AirTrunk's Japan platform, which has since grown to additional campuses in the Tokyo and Osaka regions.
- ▮300+ MW planned, Japan's largest hyperscale campus
- ▮Opened November 2021 after 45-week initial build
- ▮Design PUE 1.15 with dedicated 66 kV substations
- ▮Seven buildings, 102 data halls, 80,000 sqm technical space
- ▮Carrier neutral with diverse network entry paths
Colocation pricing: Japan & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Tokyo (Inzai)
Source — Verified against operator sources · data pending on-site verification