▮▮Coloprice

Digital Edge TYO3

Operational

Digital Edge TYO3 is a data center in Tokyo, Japan, operated by Digital Edge, with 3.9 MW of published IT capacity, currently operational.

Digital Edge colocation facility in Tokyo's Shinjuku district with 3.9 MW of IT power across 1,615 cabinets, connected to the operator's TYO2 site via its Cross Link fabric.

Digital Edge TYO3 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

8 of 14 fields published · Operator? Add or correct data →

Units
Operator
Digital Edge
City
Tokyo, Japan
Power, MW
3.9 MW
Cooling
Air
Floor space
1,658 m²
Racks
1,615
Market benchmark
$280 per kW per month wholesale · Tokyo (Inzai), Japan
Index rate for the market, not this operator’s price list
Address
16-9 Kabukicho 2-chome, Shinjuku, Tokyo 160-0021, Japan

1 sources · data pending on-site verification

E

Coloprice Score

27 out of 100

Class E · #40 of 150 in Japan

  • Resilience0/35
  • Compliance0/20
  • Transparency12/20
  • Scale8/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Digital Edge TYO3 — Coloprice Score 27
<a href="https://coloprice.com/data-centers/japan/tokyo/digital-edge-tyo3-tokyo/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/digital-edge-tyo3-tokyo.svg"
    alt="Digital Edge TYO3 — Coloprice Score 27" height="64">
</a>

Connectivity: 1 networks and 0 internet exchanges are present in this facility.

TYO3 sits in Shinjuku, one of Tokyo's central business districts, in a seven-story purpose-built building offering 1,658 square meters of colocation space across 1,615 cabinets at roughly 2.4 kVA each. Power is drawn from three separate substations feeding an N+1 SUPS configuration, backed by two 3,500 kVA gas turbine generators, with cooling handled by air-cooled package units and a designed annual PUE of 1.80 — higher than Digital Edge's other Tokyo sites, consistent with a retrofit rather than a greenfield build. The facility connects to Digital Edge's TYO2 (formerly ComSpace1) data center and to third-party carrier infrastructure in Otemachi over the operator's Cross Link fabric. Digital Edge positions TYO3 for enterprise customers seeking digital content, cloud and managed IT services rather than pure hyperscale capacity. As of the operator's most recent published specification sheet, ISO 14001, 27001 and 45001 certifications for the site were listed as planned rather than obtained, though the facility itself is operational and marketed for colocation today.

  • ▮3.9 MW IT capacity across 1,615 cabinets, 1,658 sqm
  • ▮Central Shinjuku location, linked to TYO2 via Cross Link
  • ▮N+1 SUPS power, two 3,500 kVA gas turbine generators
  • ▮Designed annual PUE 1.80; ISO certifications listed as in-progress

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Tokyo

FacilityOperatorPower, MWTierStatus
Digital Edge TYO3Digital Edge3.9—Operational
AirTrunk TOK1 Tokyo EastAirTrunk300—Operational
Colt DCS Tokyo Inzai 4Colt DCS20—Operational
Digital Edge TYO2Digital Edge——Operational
Equinix TY12xEquinix54—Operational
Equinix TY1Equinix——Operational

Source — Verified against operator sources · data pending on-site verification

  • Digital Edge — TYO3 Tokyo Data Center