IIJ Shiroi Data Center Campus

Operational

Shiroi City, Chiba Prefecture (Greater Tokyo)

IIJ Shiroi Data Center Campus is a data center in Tokyo, Japan, operated by Internet Initiative Japan (IIJ), with 20 MW of published IT capacity, currently operational.

IIJ's phased Greater Tokyo campus in Shiroi, Chiba, with two operational phases totaling 20 MW and a third, water-cooling-ready phase planned for FY2026.

IIJ Shiroi Data Center Campus — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Internet Initiative Japan (IIJ)
City
Tokyo, Japan
Power, MW
20 MW
Cooling
Air
Floor space
40,000 m²
JDCC Facility Standard Tier 3FISCISO 27001ISO 14001
D

Coloprice Score

37 out of 100

Class D · #20 of 68 in Japan

  • Resilience0/35
  • Compliance10/20
  • Transparency9/20
  • Scale11/15
  • Maturity7/10
How the score is calculated →
Embed score badge
IIJ Shiroi Data Center Campus — Coloprice Score 37
<a href="https://coloprice.com/data-centers/japan/tokyo/iij-shiroi-data-center-campus/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/iij-shiroi-data-center-campus.svg"
    alt="IIJ Shiroi Data Center Campus — Coloprice Score 37" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

IIJ Shiroi Data Center Campus — Top 25 data centers in Japan 2026
#20 of 68 · See the list →
IIJ Shiroi Data Center Campus — Top 25 data centers in Tokyo (Inzai), Japan 2026
#17 of 49 · See the list →

IIJ Shiroi Data Center Campus is Internet Initiative Japan's multi-phase data center site in Shiroi City, Chiba Prefecture, part of the same Greater Tokyo data center corridor — near Inzai — where Colt DCS and MC Digital Realty also operate campuses already in this catalog. The full site covers roughly 40,000 sqm. Phase 1 opened in May 2019 with about 700 racks and 10 MW of capacity; Phase 2 followed in July 2023 with a further 1,100 racks and 10 MW, bringing operational capacity to roughly 20 MW combined. A third phase is planned for fiscal year 2026, adding about 1,000 racks and up to 25 MW with water-cooling readiness for high-density deployments. The campus holds JDCC Facility Standard Tier 3 certification (with some systems meeting Tier 4 criteria), FISC compliance for financial-sector workloads, and ISO 27001/14001 certification, with a disclosed average PUE around 1.3.

  • ~20 MW operational across Phase 1 (2019) and Phase 2 (2023), ~1,800 racks combined
  • Phase 3 planned FY2026: up to 25 MW, ~1,000 more racks, water-cooling ready
  • JDCC Tier 3 (partial Tier 4), FISC, ISO 27001/14001 certified
  • Disclosed average PUE of approximately 1.3

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Tokyo

Source — Verified against operator sources · data pending on-site verification