▮▮Coloprice

PDG JH1

Operational

Sedenak Tech Park (STeP), Kulai, Johor

PDG JH1 is a data center in Kulai, Malaysia, operated by Princeton Digital Group, with 200 MW of published IT capacity, currently operational, opened in 2024.

PDG's flagship AI-ready hyperscale campus at Sedenak Tech Park, Johor, now disclosed at 200 MW across four buildings — one of the largest AI-ready data centers in Southeast Asia.

PDG JH1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Princeton Digital Group
City
Kulai, Malaysia
Power, MW
200 MW
Cooling
Air
Opened
2024
Floor space
80,000 m²
AI-ready
Yes
E

Coloprice Score

34 out of 100

Class E · #11 of 64 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency11/20
  • Scale13/15
  • Maturity10/10
How the score is calculated →
Embed score badge
PDG JH1 — Coloprice Score 34
<a href="https://coloprice.com/data-centers/malaysia/kulai/pdg-jh1/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/pdg-jh1.svg"
    alt="PDG JH1 — Coloprice Score 34" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

PDG JH1 — Top 25 data centers in Malaysia 2026
#11 of 64 · See the list →
PDG JH1 — Best data center in Kulai, Malaysia 2026
#1 of 7 · See the list →

JH1 is Princeton Digital Group's flagship AI-ready hyperscale campus at Sedenak Tech Park in Kulai, Johor, developed on land acquired from JLand Group and planned for more than 150 MW of capacity representing roughly USD 1.5 billion of investment. The first phase, comprising 52 MW, was delivered in July 2024 just twelve months after groundbreaking — an unusually fast build for a campus of this scale — with a first-phase investment of around RM 2 billion. PDG designed JH1 for the AI training and hyperscale cloud workloads driving the Johor market, and one of its buildings (DC2) carries OCP Ready for Hyperscale recognition from the Open Compute Project. Sustainability measures include rooftop solar generation, and the campus was financed in part through an RM 1.276 billion green loan. Sitting within the Sedenak cluster that has become Johor's principal hyperscale corridor, JH1 serves some of the world's largest technology companies and is the natural landing point in Malaysia for large-block AI capacity requirements. PDG's current portfolio page now discloses JH1 at 200 MW across four buildings and 80,000 sqm of colocation area, up from the 150 MW first-phase figure, as later construction phases have come online; PDG markets it as one of the largest AI-ready data centers in Southeast Asia.

  • 200 MW AI-ready hyperscale campus at Sedenak Tech Park, Johor
  • 52 MW phase one delivered July 2024, twelve months after groundbreaking
  • OCP Ready for Hyperscale recognition (DC2 building)
  • Rooftop solar and an RM 1.276 billion green loan backing the build
  • Serves hyperscale cloud and AI training deployments

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Kulai

Source — Verified against operator sources · data pending on-site verification