7 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Kulai: 7 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.135
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 4 AI-ready · 1,468+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Kulai, Malaysia | · · · | $0.135 | 7 | — |
| Singapore | $403 | $0.270 | 49 | — |
| Indonesia | · · · | $0.063 | 88 | — |
| Thailand | · · · | $0.128 | 44 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Kulai carries the largest planned capacity of any city in this index — 1,118 MW across six facilities, ahead of Batam's 882 MW and well past Cyberjaya's 720 MW — with three of the six operating. This is greenfield hyperscale: Princeton Digital Group, Bridge Data Centres, Vantage and the GDS with YTL Power venture building campuses on Johor land at Malaysia's $0.129/kWh, three of the six classed AI-ready and none certified Tier III or IV. The missing certification is not a quality signal; campuses built to one anchor tenant's specification are commissioned against that specification instead. The pricing consequence is that there is no rate to quote. Capacity is contracted in multi-megawatt blocks on long leases, often years before energisation, and the live terms are delivery date and power commitment. Below roughly a megawatt of demand, a buyer is not the customer this cluster was built for and will do better in Cyberjaya or Kuala Lumpur.
Frequently asked questions
How much does colocation cost in Kulai, Malaysia?
No published wholesale $/kW benchmark exists for Kulai, Malaysia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 7 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Kulai, Malaysia?
Commercial electricity in Kulai, Malaysia is $0.135 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 7 facilities in our catalog, 4 of them announced or under construction.
Where is colocation cheaper near Kulai, Malaysia?
On power alone, Indonesia ($0.063/kWh), Thailand ($0.128/kWh) run below Kulai, Malaysia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Kulai, Malaysia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Bridge Data Centres MY06 | Bridge Data Centres | — | — | Operational |
| GDS at YTL Green Data Center Park | GDS Holdings / YTL Power | 168 | — | Announced |
| PDG JH1 | Princeton Digital Group | 200 | — | Operational |
| PDG JH2 | Princeton Digital Group | 300 | — | Announced |
| Vantage Johor Campus (former Yondr Sedenak) | Vantage Data Centers | 300 | — | Operational |
| YTL Green Data Center Park | YTL Data Center Holdings | 500 | — | Under construction |
| Global Switch Johor | Global Switch | — | — | Announced |