▮▮Coloprice

Vantage Data Centers Sedenak: 300 MW Johor campus

Operational

Sedenak Tech Park, Kulai, Johor

Vantage Johor Campus (former Yondr Sedenak) is a data center in Kulai, Malaysia, operated by Vantage Data Centers, with 300 MW of published IT capacity, currently operational, opened in 2025.

300 MW hyperscale campus on 72.5 acres in Sedenak Tech Park, Johor, developed by Yondr Group (first 25 MW handed over early) and sold to Vantage Data Centers in November 2025.

Vantage Johor Campus (former Yondr Sedenak) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · in operation
Operator
Vantage Data Centers
City
Kulai, Malaysia
Power, MW
300 MW
Cooling
Liquid
Opened
2025
AI-ready
Yes
E

Coloprice Score

32 out of 100

Class E · #13 of 64 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency8/20
  • Scale15/15
  • Maturity9/10
How the score is calculated →
Embed score badge
Vantage Johor Campus (former Yondr Sedenak) — Coloprice Score 32
<a href="https://coloprice.com/data-centers/malaysia/kulai/vantage-johor-sedenak/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/vantage-johor-sedenak.svg"
    alt="Vantage Johor Campus (former Yondr Sedenak) — Coloprice Score 32" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Vantage Johor Campus (former Yondr Sedenak) — Top 25 data centers in Malaysia 2026
#13 of 64 · See the list →
Vantage Johor Campus (former Yondr Sedenak) — Top 3 data centers in Kulai, Malaysia 2026
#2 of 7 · See the list →

This 300 MW hyperscale campus in Sedenak Tech Park changed hands in November 2025, when Yondr Group completed its sale to Vantage Data Centers — a deal that also covered the supporting Singapore business. Developed by Yondr on 72.5 acres in Kulai, Johor, the project reached its first completion milestone six months ahead of schedule in June 2025, handing over an initial 25 MW of IT capacity within a first building designed for 98 MW; Yondr had earlier secured more than USD 900 million in green-loan project financing to fund it. Unlike conventional air-cooled colocation, the facility was engineered from the outset for AI and machine-learning deployments, with direct-to-chip liquid cooling and heat-rejection design targeting aggressive PUE figures for GPU clusters. Billed among the largest single data centre campuses in Southeast Asia, it now anchors Vantage's Johor presence and is squarely aimed at hyperscalers and AI platforms placing large contiguous capacity blocks near Singapore without Singapore's power constraints.

  • 300 MW campus on 72.5 acres in Sedenak Tech Park, Johor
  • First 25 MW delivered June 2025, six months ahead of schedule
  • First building designed for 98 MW IT load
  • Direct-to-chip liquid cooling, engineered for AI/ML GPU workloads
  • Acquired by Vantage Data Centers from Yondr, completed November 2025

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Kulai

Source — Verified against operator sources · data pending on-site verification