Vantage Data Centers Sedenak: 300 MW Johor campus
OperationalSedenak Tech Park, Kulai, Johor
Vantage Johor Campus (former Yondr Sedenak) is a data center in Kulai, Malaysia, operated by Vantage Data Centers, with 300 MW of published IT capacity, currently operational, opened in 2025.
300 MW hyperscale campus on 72.5 acres in Sedenak Tech Park, Johor, developed by Yondr Group (first 25 MW handed over early) and sold to Vantage Data Centers in November 2025.

- Operator
- Vantage Data Centers
- City
- Kulai, Malaysia
- Power, MW
- 300 MW
- Cooling
- Liquid
- Opened
- 2025
- AI-ready
- Yes
Coloprice Score
32 out of 100
Class E · #13 of 64 in Malaysia
- Resilience0/35
- Compliance0/20
- Transparency8/20
- Scale15/15
- Maturity9/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
This 300 MW hyperscale campus in Sedenak Tech Park changed hands in November 2025, when Yondr Group completed its sale to Vantage Data Centers — a deal that also covered the supporting Singapore business. Developed by Yondr on 72.5 acres in Kulai, Johor, the project reached its first completion milestone six months ahead of schedule in June 2025, handing over an initial 25 MW of IT capacity within a first building designed for 98 MW; Yondr had earlier secured more than USD 900 million in green-loan project financing to fund it. Unlike conventional air-cooled colocation, the facility was engineered from the outset for AI and machine-learning deployments, with direct-to-chip liquid cooling and heat-rejection design targeting aggressive PUE figures for GPU clusters. Billed among the largest single data centre campuses in Southeast Asia, it now anchors Vantage's Johor presence and is squarely aimed at hyperscalers and AI platforms placing large contiguous capacity blocks near Singapore without Singapore's power constraints.
- ▮300 MW campus on 72.5 acres in Sedenak Tech Park, Johor
- ▮First 25 MW delivered June 2025, six months ahead of schedule
- ▮First building designed for 98 MW IT load
- ▮Direct-to-chip liquid cooling, engineered for AI/ML GPU workloads
- ▮Acquired by Vantage Data Centers from Yondr, completed November 2025
Colocation pricing: Malaysia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Kulai
Source — Verified against operator sources · data pending on-site verification