YTL Green Data Center Park
Under constructionKulai, Johor
YTL Green Data Center Park is a data center in Kulai, Malaysia, operated by YTL Data Center Holdings, with 500 MW of published IT capacity, currently under construction.
500 MW solar-powered data centre campus on 275 acres in Kulai, Johor, with the first 72 MW under development, Shopee as an anchor co-locator and an AI data centre planned in collaboration with NVIDIA.

- Operator
- YTL Data Center Holdings
- City
- Kulai, Malaysia
- Power, MW
- 500 MW
- Cooling
- Air
- AI-ready
- Yes
Coloprice Score
22 out of 100
limited data · #31 of 64 in Malaysia
- Resilience0/35
- Compliance0/20
- Transparency6/20
- Scale13/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
YTL's Kulai development takes a different route from Johor's other hyperscale parks: it pairs a planned 500 MW of data centre capacity with its own 500 MW solar plant, marketed as Malaysia's first integrated data centre park powered by renewable solar energy, with grid backup from the national utility. Located in the Iskandar region roughly 30 km from Singapore, the park launched with an RM 1.5 billion first phase after Sea Limited (Shopee's parent) signed as anchor tenant, taking 32 MW of the initial capacity; the first 72 MW facility was targeted for operation in early 2024. The site has since become the home of YTL AI Cloud, with a first 20 MW facility built around liquid-cooled NVIDIA GB200 GPU supercomputers completed as part of a multi-billion-dollar collaboration with NVIDIA, and GDS is also developing on the campus. Dark fibre into Singapore provides low-latency reach for tenants. The park courts hyperscalers, AI platforms and companies with renewable-energy mandates seeking green capacity at Johor scale.
- ▮500 MW campus paired with dedicated 500 MW solar generation
- ▮Sea Limited (Shopee) anchor tenant with 32 MW of first-phase capacity
- ▮First phase RM 1.5 billion; initial 72 MW facility targeted for early 2024
- ▮20 MW NVIDIA GB200 liquid-cooled AI facility completed for YTL AI Cloud
- ▮Dark fibre to Singapore, ~30 km away in Johor's Iskandar region
Colocation pricing: Malaysia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Kulai
Source — Verified against operator sources · data pending on-site verification