3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Apodaca: 3 facilities, colocation pricing
Colocation pricing and providers in Apodaca →
How many data centers are in Apodaca?
Coloprice tracks 3 data centers in Apodaca, Mexico: 3 operational, 0 under construction and 0 announced, run by 3 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.241
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Apodaca, Mexico | · · · | $0.241 | 3 | — |
| Brazil | $160 | $0.152 | 245 | — |
| United States | $196 | $0.117 | 1344 | — |
| Chile | $200 | $0.212 | 54 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Apodaca?
Coloprice tracks 3 data centers in Apodaca, Mexico: 3 operational, 0 under construction and 0 announced, run by 3 operators.
Which operators run data centers in Apodaca?
By number of facilities tracked: Axtel / Avantel Infraestructura (1), Triara (Telmex) (1), Equinix (1).
How much does colocation cost in Apodaca, Mexico?
No published wholesale $/kW benchmark exists for Apodaca, Mexico yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Apodaca, Mexico?
Commercial electricity in Apodaca, Mexico is $0.241 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Apodaca, Mexico?
On power alone, Brazil ($0.152/kWh), United States ($0.117/kWh), Chile ($0.212/kWh) run below Apodaca, Mexico. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Apodaca, Mexico market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Apodaca vs QuerétaroApodaca vs Mexico CityApodaca vs Monterrey
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Data Center Axtel Apodaca | Axtel / Avantel Infraestructura | — | III | Operational |
| Triara Data Center Apodaca (Bunker 2E) | Triara (Telmex) | — | — | Operational |
| Equinix MO2 - Monterrey | Equinix | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.