▮▮Coloprice
← Mexico

3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Apodaca: 3 facilities, colocation pricing

Colocation pricing and providers in Apodaca →

How many data centers are in Apodaca?

Coloprice tracks 3 data centers in Apodaca, Mexico: 3 operational, 0 under construction and 0 announced, run by 3 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.241

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Apodaca, Mexico· · ·$0.2413—
Brazil$160$0.152245—
United States$196$0.1171344—
Chile$200$0.21254—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Apodaca?

Coloprice tracks 3 data centers in Apodaca, Mexico: 3 operational, 0 under construction and 0 announced, run by 3 operators.

Which operators run data centers in Apodaca?

By number of facilities tracked: Axtel / Avantel Infraestructura (1), Triara (Telmex) (1), Equinix (1).

How much does colocation cost in Apodaca, Mexico?

No published wholesale $/kW benchmark exists for Apodaca, Mexico yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Apodaca, Mexico?

Commercial electricity in Apodaca, Mexico is $0.241 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Apodaca, Mexico?

On power alone, Brazil ($0.152/kWh), United States ($0.117/kWh), Chile ($0.212/kWh) run below Apodaca, Mexico. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Apodaca, Mexico market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Apodaca vs QuerétaroApodaca vs Mexico CityApodaca vs Monterrey

Data centers

FacilityOperatorPower, MWTierStatus
Data Center Axtel ApodacaAxtel / Avantel Infraestructura—IIIOperational
Triara Data Center Apodaca (Bunker 2E)Triara (Telmex)——Operational
Equinix MO2 - MonterreyEquinix——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.