1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Cancún: 1 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.241
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Cancún, Mexico | · · · | $0.241 | 1 | — |
| Brazil | $160 | $0.152 | 104 | — |
| United States | $196 | $0.117 | 982 | — |
| Chile | $200 | $0.212 | 36 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Cancún, Mexico?
No published wholesale $/kW benchmark exists for Cancún, Mexico yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Cancún, Mexico?
Commercial electricity in Cancún, Mexico is $0.241 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Cancún, Mexico?
On power alone, Brazil ($0.152/kWh), United States ($0.117/kWh), Chile ($0.212/kWh) run below Cancún, Mexico. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Cancún, Mexico market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Telxius Cancún Landing Gateway & Edge Data Center | Telxius | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.