1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Ciudad de México: 1 facilities, colocation pricing
How many data centers are in Ciudad de México?
Coloprice tracks 1 data centers in Ciudad de México, Mexico: 1 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.241
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Ciudad de México, Mexico | · · · | $0.241 | 1 | — |
| Brazil | $160 | $0.152 | 244 | — |
| United States | $196 | $0.117 | 1332 | — |
| Chile | $200 | $0.212 | 52 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Ciudad de México?
Coloprice tracks 1 data centers in Ciudad de México, Mexico: 1 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Ciudad de México?
By number of facilities tracked: Dirección General de Cómputo y de Tecnologías de Información y Comunicación de la Universidad Nacional Autónoma de México (1).
How much does colocation cost in Ciudad de México, Mexico?
No published wholesale $/kW benchmark exists for Ciudad de México, Mexico yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Ciudad de México, Mexico?
Commercial electricity in Ciudad de México, Mexico is $0.241 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Ciudad de México, Mexico?
On power alone, Brazil ($0.152/kWh), United States ($0.117/kWh), Chile ($0.212/kWh) run below Ciudad de México, Mexico. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Ciudad de México, Mexico market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Dirección General de Cómputo y de Tecnologías de Información y Comunicación de la Universidad Nacional Autónoma de México Centro de Datos II SSMC DGTIC-IIMAS | Dirección General de Cómputo y de Tecnologías de Información y Comunicación de la Universidad Nacional Autónoma de México | — | 2 | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Mexico
Colocation quotes in Ciudad de México: free, reply within one business day
Get Quotes →