6 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Monterrey: 6 facilities, colocation pricing
Colocation pricing and providers in Monterrey →
How many data centers are in Monterrey?
Coloprice tracks 6 data centers in Monterrey, Mexico: 6 operational, 0 under construction and 0 announced, run by 6 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.241
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Monterrey, Mexico | · · · | $0.241 | 6 | — |
| Brazil | $160 | $0.152 | 245 | — |
| United States | $196 | $0.117 | 1344 | — |
| Chile | $200 | $0.212 | 54 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Monterrey?
Coloprice tracks 6 data centers in Monterrey, Mexico: 6 operational, 0 under construction and 0 announced, run by 6 operators.
Which operators run data centers in Monterrey?
By number of facilities tracked: Equinix (1), Flō Networks (1), NH Solutions (NH Infraestructura SAPI de C.V.) (1), CEMEX (1), KIO Networks (1).
How much does colocation cost in Monterrey, Mexico?
No published wholesale $/kW benchmark exists for Monterrey, Mexico yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 6 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Monterrey, Mexico?
Commercial electricity in Monterrey, Mexico is $0.241 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 6 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Monterrey, Mexico?
On power alone, Brazil ($0.152/kWh), United States ($0.117/kWh), Chile ($0.212/kWh) run below Monterrey, Mexico. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Monterrey, Mexico market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Monterrey vs QuerétaroMexico City vs MonterreyApodaca vs Monterrey
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Equinix MO1 IBX | Equinix | — | — | Operational |
| EDGE Data Center MTY | Flō Networks | — | III | Operational |
| NH Solutions Edge Data Center (Pabellón M) | NH Solutions (NH Infraestructura SAPI de C.V.) | — | — | Operational |
| CEMEX Global Data Center | CEMEX | — | III | Operational |
| KIO Monterrey 1 (MTY1) | KIO Networks | — | — | Operational |
| Neutral Networks Monterrey (MTY-NN) | Even Group | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Mexico
Colocation quotes in Monterrey: free, reply within one business day
Get Quotes →