AMS11
Under constructionAMS11 is a data center in Amsterdam, Netherlands, operated by Digital Realty (Interxion), currently under construction.
Carrier-neutral Digital Realty (Interxion) building under construction at Koolhovenlaan 35-45 in Schiphol-Rijk, targeted to open in 2026.

- Operator
- Digital Realty (Interxion)
- City
- Amsterdam, Netherlands
- Power, MW
- —
- Cooling
- Air
- Floor space
- 10,300 m²
- Renewable energy
- 100%
- Market benchmark
- $180 per kW per month wholesale · Amsterdam, Netherlands
- Index rate for the market, not this operator’s price list
- Address
- Koolhovenlaan 35-45, 1119 NB Schiphol-Rijk, Netherlands · Open in maps ↗
1 sources · data pending on-site verification
Coloprice Score
30 out of 100
Class E · #40 of 130 in Netherlands
- Resilience6/35
- Compliance13/20
- Transparency8/20
- Scale0/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
AMS11 is a Digital Realty (Interxion) building under construction at Koolhovenlaan 35-45 in Schiphol-Rijk, about ten minutes from Amsterdam Schiphol Airport, with the operator targeting a 2026 opening. The completed building is planned at 111,000 sq ft (10,300 sqm). Digital Realty specifies 2N UPS redundancy and N+1 cooling redundancy for the site and lists PCI-DSS, SOC 2 and CarbonNeutral certification on the facility's page, alongside a 100% renewable energy commitment consistent with its other Amsterdam campuses. The facility will be carrier-neutral, with deployment options from single cabinets to full suites, though Digital Realty has not published AMS11's planned power capacity in MW, floor count, rack density, or a specific opening date beyond the 2026 target. AMS11 will join Digital Realty's existing Amsterdam cluster, which already includes campuses such as AMS18 at Wenckebachweg; the company markets the Schiphol-Rijk location for its airport proximity and access to the metro area's carrier-dense interconnection ecosystem.
- ▮111,000 sq ft (10,300 sqm) building under construction, targeted to open in 2026.
- ▮2N UPS redundancy and N+1 cooling redundancy planned.
- ▮PCI-DSS, SOC 2 and CarbonNeutral certification listed for the site; 100% renewable energy.
- ▮Located in Schiphol-Rijk, about 10 minutes from Amsterdam Schiphol Airport.
Colocation pricing: Netherlands & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Amsterdam: free, reply within one business day
Get Quotes →Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Amsterdam
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| AMS11 | Digital Realty (Interxion) | — | — | Under construction |
| Digital Realty AMS3 | Digital Realty (Interxion) | — | — | Operational |
| Digital Realty AMS9 | Digital Realty (Interxion) | — | — | Operational |
| Equinix AM4 | Equinix | — | — | Operational |
| Global Switch Amsterdam | Global Switch | — | — | Operational |
| NTT Amsterdam 1 Data Center | NTT Global Data Centers | 20.7 | — | Operational |
Source — Verified against operator sources · data pending on-site verification