51 facilities · 28 operators · 108 MW tracked
Colocation in Amsterdam: pricing, providers and capacity
28 operators run 51 tracked data centers in Amsterdam (49 operational, 108+ MW published, 3 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
Amsterdam metro metro market: all facilities, capacity and operators →
How much does colocation cost in Amsterdam?
28 operators run 51 tracked data centers in Amsterdam; the largest by sites is Digital Realty (10). Wholesale colocation in Amsterdam is benchmarked at $180 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), Fig. 5 — Q1 2026, 250–500 kW, H2 2025 – Q2 2026). Published retail list prices in this market start at €500 (Half rack (23U), HOSTKEY). 2 operators publish rate cards here.
Wholesale benchmark
$180 /kW·mo
Amsterdam · CBRE, Global Data Center Trends 2026 (17 June 2026), Fig. 5 — Q1 2026, 250–500 kW · H2 2025 – Q2 2026
250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE: rents in Europe’s four major markets rose year-over-year in Q1 2026
Published retail prices
- €500 — Half rack (23U), HOSTKEY (Amsterdam (euNetworks); 3 kW (2 × 16 A PDU); electricity €0.50/kWh metered)
- €800 — Full rack (48U), HOSTKEY (Amsterdam (euNetworks); 6 kW (2 × 32 A PDU); electricity €0.50/kWh metered)
- €360 per kW per month — Per kW, unmanaged, MIRhosting (Amsterdam; per kW, all-in)
- €410 per kW per month — Per kW, managed (popular), MIRhosting (Amsterdam; per kW, all-in)
Colocation providers in Amsterdam
Operators with tracked data centers in Amsterdam, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Digital Realty | 10 / 9 | not published | Digital Realty AMS3 | CarbonNeutral, SOC 2, PCI-DSS | — |
| Equinix | 9 / 9 | not published | Equinix AM1 | Climate Neutral Data Centre Pact, Cyber Essentials, EU Code of Conduct | — |
| Scaleway | 3 / 3 | not published | Scaleway AMS1 | not published | — |
| NorthC | 2 / 2 | 6 | NorthC Amsterdam 1 | ISO 27001, ISO 9001, ISO 14001 | — |
| nLighten | 2 / 2 | 5 | nLighten Amsterdam II (AMS2) | not published | 1 |
| Colt DCS | 2 / 2 | not published | DRT Science Park 120 | not published | — |
| Qupra | 2 / 2 | not published | Qupra DC | not published | — |
| CyrusOne | 1 / 1 | 54 | CyrusOne AMS1 | ISO 14001 | — |
| NTT Global Data Centers | 1 / 1 | 21 | NTT Amsterdam 1 Data Center | ISO 9001, ISO 22301, ISO 45001 | — |
| Switch Datacenters | 1 / 1 | 9 | Switch Datacenters AMS3 | Tier 3+ | 1 |
| maincubes | 1 / 1 | 5 | maincubes AMS01 | ISO 27001, ISO 9001, ISO 14001 | — |
| Serverfarm | 1 / 1 | 5 | Serverfarm AMS1 | not published | — |
| Templus | 1 / 1 | 4 | Templus AMS01 | Tier III Ready (per operator) | — |
| Databarn | 1 / 1 | not published | Databarn Amsterdam | not published | — |
| Datacenter.com | 1 / 1 | not published | Datacenter.com AMS1 | not published | — |
| EdgeConneX | 1 / 1 | not published | EdgeConneX AMS01 | PCI-DSS, SOC 2 Type 2, ISO 27001 | — |
| euNetworks Group | 1 / 1 | not published | euNetworks Amsterdam | not published | — |
| Global Switch | 1 / 1 | not published | Global Switch Amsterdam | ISO 27001, ISO 9001, ISO 14001 | 1 |
| IPTP Networks | 1 / 1 | not published | IPTP, Matrix 4, Amsterdam, The Netherlands | not published | — |
| Iron Mountain | 1 / 1 | not published | Iron Mountain Amsterdam | not published | — |
| Keppel DC REIT | 1 / 1 | not published | Keppel DC Amsterdam | not published | — |
| Kolo | 1 / 1 | not published | Kolo NL4 (Amsterdam) | not published | — |
| KPN | 1 / 1 | not published | KPN Datacenter Paalbergweg | Uptime Institute Tier III Certification of Design Documents | — |
| Nikhef | 1 / 1 | not published | Nikhef Data Center Amsterdam | not published | — |
| phoenixNAP | 1 / 1 | not published | phoenixNAP Amsterdam Data Center | not published | — |
| Pure Data Centres Group | 1 / 0 | not published | Pure Data Centres — Amsterdam (Westpoort, AMS01) | not published | — |
| Serverhosh Internet Service | 1 / 1 | not published | 3W-DC01 | not published | — |
| XS4ALL Internet | 1 / 1 | not published | XS4ALL DC2 | not published | — |
Availability in Amsterdam: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Amsterdam?
By tracked sites: Digital Realty with 10. By published IT capacity: CyrusOne with 54 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Amsterdam, including some that do not sell space.
Is there colocation capacity available in Amsterdam right now?
Coloprice tracks 51 facilities here (49 operational, 2 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Amsterdam?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Amsterdam benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Amsterdam
One brief, several operators with capacity in Amsterdam, Netherlands, same terms. Independent — no operator pays for position.
Colocation in Amsterdam? One brief, several quotes.
Request quotes →