35 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Amsterdam: 35 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.179
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 3 AI-ready · 104+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Amsterdam, Netherlands | · · · | $0.179 | 35 | — |
| Germany | · · · | $0.269 | 122 | 11 ms |
| United Kingdom | · · · | $0.454 | 109 | 11 ms |
| France | · · · | $0.173 | 70 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Amsterdam is an interconnection metro rather than a capacity metro, and the catalog shows it: 6 facilities carrying 26 MW between them, against 219 MW in London across twice the site count. Average footprints are small because the product being sold is a cabinet close to AMS-IX, not a hall of bulk compute. Nothing is in the pipeline and all six sites are operating, so the metro cannot absorb a large new requirement quickly and the top of the market prices for that. Latency is the reason to accept it: 11 ms to both Frankfurt and London makes a three-metro European footprint practical, with Northern Virginia 85 ms away. Because the value here is connectivity, model the cross-connect and peering-port count across the full term alongside the rack rate, since that is where the recurring cost accumulates in a metro bought for interconnection.
Frequently asked questions
How much does colocation cost in Amsterdam, Netherlands?
No published wholesale $/kW benchmark exists for Amsterdam, Netherlands yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 35 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Amsterdam, Netherlands?
Commercial electricity in Amsterdam, Netherlands is $0.179 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 35 facilities in our catalog, 2 of them announced or under construction.
Where is colocation cheaper near Amsterdam, Netherlands?
On power alone, France ($0.173/kWh) run below Amsterdam, Netherlands. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Amsterdam, Netherlands market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Digital Realty AMS3 | Digital Realty (Interxion) | — | — | Operational |
| Digital Realty AMS9 | Digital Realty (Interxion) | — | — | Operational |
| Equinix AM4 | Equinix | — | — | Operational |
| Global Switch Amsterdam | Global Switch | — | — | Operational |
| NTT Amsterdam 1 Data Center | NTT Global Data Centers | 20.7 | — | Operational |
| maincubes AMS01 | maincubes | 5 | — | Operational |
| Equinix AM1 | Equinix | — | — | Operational |
| Equinix AM2 | Equinix | — | — | Operational |
| Equinix AM3 | Equinix | — | — | Operational |
| Equinix AM5 | Equinix | — | — | Operational |
| Equinix AM6 | Equinix | — | — | Operational |
| Equinix AM7 | Equinix | — | — | Operational |
| Equinix AM8 | Equinix | — | — | Operational |
| Equinix AM11 | Equinix | — | — | Operational |
| AMS5 | Digital Realty (Interxion) | — | — | Operational |
| AMS6 | Digital Realty (Interxion) | — | — | Operational |
| AMS7 | Digital Realty (Interxion) | — | — | Operational |
| AMS8 | Digital Realty (Interxion) | — | — | Operational |
| AMS10 | Digital Realty (Interxion) | — | — | Operational |
| AMS11 | Digital Realty (Interxion) | — | — | Under construction |
| AMS17 | Digital Realty (Interxion) | — | — | Operational |
| AMS18 | Digital Realty (Interxion) | — | — | Operational |
| CyrusOne AMS1 | CyrusOne | 54 | — | Operational |
| NorthC Amsterdam 1 | NorthC | 2.4 | — | Operational |
| NorthC Amsterdam 2 | NorthC | 3.44 | — | Operational |
| Keppel DC Amsterdam | Keppel DC REIT | — | — | Operational |
| Switch Datacenters AMS3 | Switch Datacenters | 8.6 | — | Operational |
| Kolo NL4 (Amsterdam) | Kolo | — | — | Operational |
| Datacenter.com AMS1 | Datacenter.com | — | — | Operational |
| nLighten Amsterdam I (AMS1) | nLighten | 1.1 | — | Operational |
| nLighten Amsterdam II (AMS2) | nLighten | 4.2 | — | Operational |
| Serverfarm AMS1 | Serverfarm | 5 | — | Operational |
| EdgeConneX AMS01 | EdgeConneX | — | — | Operational |
| Pure Data Centres — Amsterdam (Westpoort, AMS01) | Pure Data Centres Group | — | — | Under construction |
| KPN Datacenter Paalbergweg | KPN | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.