▮▮Coloprice

Khazna AUH8 Masdar City

Under construction

Masdar City, Abu Dhabi

Khazna AUH8 Masdar City is a data center in Abu Dhabi, United Arab Emirates, operated by Khazna Data Centers, currently under construction.

Khazna's second data center at Masdar City, Abu Dhabi, on which the company has broken ground as part of its UAE expansion.

Khazna AUH8 Masdar City — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Khazna Data Centers
City
Abu Dhabi, United Arab Emirates
Power, MW
Cooling
Air

Coloprice Score

5 out of 100

limited data · #59 of 60 in United Arab Emirates

  • Resilience0/35
  • Compliance0/20
  • Transparency2/20
  • Scale0/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Khazna AUH8 Masdar City — Coloprice Score 5
<a href="https://coloprice.com/data-centers/uae/abu-dhabi/khazna-auh8-masdar-city/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/khazna-auh8-masdar-city.svg"
    alt="Khazna AUH8 Masdar City — Coloprice Score 5" height="64">
</a>

Rather than opening a new location, AUH8 grows an existing one: it is Khazna's second data center at Masdar City, rising beside the operational AUH6 and set to lift the campus's combined IT load from roughly 32 MW to about 62 MW once complete — contractor materials describe it as a 30 MW building. Khazna broke ground in 2025 as part of a dual announcement with AUH4 in Mafraq, the two projects together adding 60 MW in Abu Dhabi. The build follows the same playbook as its siblings: modular design architecture to shorten delivery, adiabatic free cooling for efficiency in desert conditions, and infrastructure specified for AI as well as cloud workloads. Completion has been reported for 2026. Sitting inside Masdar City aligns the project with the district's low-carbon planning rules, and its wholesale capacity blocks are aimed at hyperscalers and large AI deployments rather than retail colocation.

  • Second Khazna data center at Masdar City, adjacent to the operational AUH6
  • Expands the campus from ~32 MW to ~62 MW combined IT load; reported as a ~30 MW building
  • Modular build with adiabatic free cooling; completion reported for 2026
  • Announced together with AUH4 Mafraq as a combined 60 MW Abu Dhabi expansion

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Abu Dhabi

Source — Verified against operator sources · data pending on-site verification