1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Milton Keynes: 1 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.442
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 2+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Milton Keynes, United Kingdom | · · · | $0.442 | 1 | — |
| Netherlands | · · · | $0.220 | 51 | — |
| Ireland | · · · | $0.210 | 23 | — |
| Germany | · · · | $0.283 | 90 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Milton Keynes, United Kingdom?
No published wholesale $/kW benchmark exists for Milton Keynes, United Kingdom yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Milton Keynes, United Kingdom?
Commercial electricity in Milton Keynes, United Kingdom is $0.442 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Milton Keynes, United Kingdom?
On power alone, Netherlands ($0.220/kWh), Ireland ($0.210/kWh), Germany ($0.283/kWh) run below Milton Keynes, United Kingdom. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Milton Keynes, United Kingdom market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Pulsant Milton Keynes SE-1 | Pulsant | 2.2 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.