H5 Data Centers Ashburn

Operational

21800 Beaumeade Circle, Ashburn, VA 20147

H5 Data Centers Ashburn is a data center in Ashburn, United States, operated by H5 Data Centers, with 42 MW of published IT capacity, currently operational.

H5 Data Centers' Ashburn building at 21800 Beaumeade Circle, a 255,000 sq ft, 42 MW new-build with up to 60 MVA available, distinct from the operator's Chantilly and Herndon Virginia sites.

H5 Data Centers Ashburn — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
H5 Data Centers
City
Ashburn, United States
Power, MW
42 MW
Cooling
Air
Floor space
23,690 m²
SOC 2 Type IIISO 27001LEED Silver
D

Coloprice Score

43 out of 100

Class D · #65 of 574 in United States

  • Resilience6/35
  • Compliance10/20
  • Transparency9/20
  • Scale11/15
  • Maturity7/10
How the score is calculated →
Embed score badge
H5 Data Centers Ashburn — Coloprice Score 43
<a href="https://coloprice.com/data-centers/usa/ashburn/h5-ashburn/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/h5-ashburn.svg"
    alt="H5 Data Centers Ashburn — Coloprice Score 43" height="64">
</a>

Connectivity: 3 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

H5 Data Centers Ashburn — Top 10 data centers in Ashburn, United States 2026
#4 of 51 · See the list →

H5 Data Centers' Ashburn facility sits at 21800 Beaumeade Circle in Loudoun County's Data Center Alley, one of three Northern Virginia sites the operator runs alongside its Chantilly campus and Herndon building. The property was built as a new construction project with 255,000 sq ft of space and 42 MW of critical capacity, backed by up to 60 MVA of available utility power. H5 phased the building's delivery, with the first phase available from the third quarter of 2024. The facility carries SOC 2 Type II audit status, ISO 27001 certification and LEED Silver design certification, matching the compliance profile H5 applies across its national portfolio of privately-owned data centers. As with the operator's other Virginia buildings, Ashburn is marketed as carrier-neutral colocation space aimed at enterprise and cloud tenants seeking a Data Center Alley address without leasing directly from the largest wholesale operators clustered nearby. H5 does not publish a specific opening year beyond the phased 2024 availability date, nor a Tier classification for this building.

  • 255,000 sq ft, 42 MW new-build at 21800 Beaumeade Circle
  • Up to 60 MVA of available utility power
  • Phase 1 availability from Q3 2024
  • SOC 2 Type II, ISO 27001, LEED Silver
  • Third H5 Virginia site alongside Chantilly and Herndon

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Ashburn

Source — Verified against operator sources · data pending on-site verification