H5 Data Centers Ashburn
Operational21800 Beaumeade Circle, Ashburn, VA 20147
H5 Data Centers Ashburn is a data center in Ashburn, United States, operated by H5 Data Centers, with 42 MW of published IT capacity, currently operational.
H5 Data Centers' Ashburn building at 21800 Beaumeade Circle, a 255,000 sq ft, 42 MW new-build with up to 60 MVA available, distinct from the operator's Chantilly and Herndon Virginia sites.

- Operator
- H5 Data Centers
- City
- Ashburn, United States
- Power, MW
- 42 MW
- Cooling
- Air
- Floor space
- 23,690 m²
Coloprice Score
43 out of 100
Class D · #65 of 574 in United States
- Resilience6/35
- Compliance10/20
- Transparency9/20
- Scale11/15
- Maturity7/10
Connectivity: 3 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
H5 Data Centers' Ashburn facility sits at 21800 Beaumeade Circle in Loudoun County's Data Center Alley, one of three Northern Virginia sites the operator runs alongside its Chantilly campus and Herndon building. The property was built as a new construction project with 255,000 sq ft of space and 42 MW of critical capacity, backed by up to 60 MVA of available utility power. H5 phased the building's delivery, with the first phase available from the third quarter of 2024. The facility carries SOC 2 Type II audit status, ISO 27001 certification and LEED Silver design certification, matching the compliance profile H5 applies across its national portfolio of privately-owned data centers. As with the operator's other Virginia buildings, Ashburn is marketed as carrier-neutral colocation space aimed at enterprise and cloud tenants seeking a Data Center Alley address without leasing directly from the largest wholesale operators clustered nearby. H5 does not publish a specific opening year beyond the phased 2024 availability date, nor a Tier classification for this building.
- ▮255,000 sq ft, 42 MW new-build at 21800 Beaumeade Circle
- ▮Up to 60 MVA of available utility power
- ▮Phase 1 availability from Q3 2024
- ▮SOC 2 Type II, ISO 27001, LEED Silver
- ▮Third H5 Virginia site alongside Chantilly and Herndon
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Ashburn
Source — Verified against operator sources · data pending on-site verification