52 facilities · 13 operators · 1,176 MW tracked
Colocation in Ashburn: pricing, providers and capacity
13 operators run 52 tracked data centers in Ashburn (50 operational, 1,176+ MW published, 5 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Ashburn?
13 operators run 52 tracked data centers in Ashburn; the largest by sites is Digital Realty (15). Wholesale colocation in Northern Virginia (Ashburn) is benchmarked at $173 per kW per month (CBRE, North America Data Center Trends H1 2026 (10MW+ blocks), H2 2025 – Q2 2026). Published retail list prices in this market start at $599 (Half cabinet (20U), Psychz Networks); a full cabinet lists from $907 per month before metered power. 1 operators publish rate cards here.
Wholesale benchmark
$173 /kW·mo
Northern Virginia (Ashburn) · CBRE, North America Data Center Trends H1 2026 (10MW+ blocks) · H2 2025 – Q2 2026
Published retail prices
- $599 — Half cabinet (20U), Psychz Networks (Ashburn; ~2 kW (8 A / 120 V or 4 A / 208 V))
- $907 — Full cabinet (42U), 1.92 kW, Psychz Networks (Ashburn; 1.92 kW (20 A / 120 V))
- $1,344 — Full cabinet (42U), 2.88 kW, Psychz Networks (Ashburn; 2.88 kW (30 A / 120 V))
- $1,563 — Full cabinet (42U), 3.33 kW, Psychz Networks (Ashburn; 3.33 kW (20 A / 208 V))
- $2,332 — Full cabinet (42U), 4.99 kW, Psychz Networks (Ashburn; 4.99 kW (30 A / 208 V))
Colocation providers in Ashburn
Operators with tracked data centers in Ashburn, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Digital Realty | 15 / 15 | not published | Digital Realty IAD39 (Round Table Plaza) | ISO 27001, SOC 2, SOC 3 | — |
| Equinix | 14 / 14 | not published | Equinix DC11 | ISO 27001, ISO 22301, SOC 1 Type II | 2 |
| NTT Global Data Centers | 6 / 5 | 143 | NTT Ashburn VA5 Data Center | not published | 1 |
| Vantage Data Centers | 3 / 2 | 590 | Vantage Ashburn I Campus | not published | — |
| DataBank | 3 / 3 | 70 | DataBank IAD3 | not published | — |
| Aligned Data Centers | 2 / 2 | 180 | Aligned IAD-01 (Ashburn) | SOC 2 Type 2, PCI DSS, HIPAA | 2 |
| QTS Data Centers | 2 / 2 | 80 | QTS Ashburn 3 | not published | — |
| Cologix | 2 / 2 | not published | Cologix ASH1 | not published | — |
| H5 Data Centers | 1 / 1 | 42 | H5 Data Centers Ashburn | SOC 2 Type II, ISO 27001, LEED Silver | — |
| Sabey Data Centers | 1 / 1 | 36 | Sabey SDC Ashburn | not published | — |
| Csquare | 1 / 1 | 36 | Csquare IAD4 | SOC 1 Type II, SOC 2 Type II, PCI-DSS | — |
| CloudHQ | 1 / 1 | not published | CloudHQ LC Campus | not published | — |
| Hetzner Online | 1 / 1 | not published | Hetzner Datacenter Ashburn | not published | — |
Availability in Ashburn: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Ashburn?
By tracked sites: Digital Realty with 15. By published IT capacity: Vantage Data Centers with 590 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Ashburn, including some that do not sell space.
Is there colocation capacity available in Ashburn right now?
Coloprice tracks 52 facilities here (50 operational, 2 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Ashburn?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Northern Virginia (Ashburn) benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Ashburn
One brief, several operators with capacity in Ashburn, United States, same terms. Independent — no operator pays for position.
Colocation in Ashburn? One brief, several quotes.
Request quotes →