Mombasa, Kenya vs Nairobi, Kenya

Both columns are built from the catalog and the price index: Mombasa — 4 facilities from 3 operators, Nairobi — 7 facilities from 6 operators. Where a benchmark or a tariff is not published, the cell says so.

Markets side by side

FieldMombasaNairobi
Tracked facilities47
Operators36
Published IT capacitynot published12 MW (2 of 7 sites publish)
Operational47
Under construction / announced00
Tier III+ certified sites01
Sites with any certification02
Liquid-cooled sites00
AI-ready sites01
Wholesale benchmark, $/kW/monthnot publishednot published
Benchmark change, yoynot publishednot published
Industrial power tariff, $/kWh$0.171$0.171
Average Coloprice Score10/100 across 4 sites19/100 across 7 sites
Latency between the twonot published

Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.

Where they differ

Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.

  • Tracked facilities: Mombasa — 4; Nairobi — 7
  • Operators: Mombasa — 3; Nairobi — 6
  • Operational: Mombasa — 4; Nairobi — 7
  • Tier III+ certified sites: Mombasa — 0; Nairobi — 1
  • Sites with any certification: Mombasa — 0; Nairobi — 2
  • AI-ready sites: Mombasa — 0; Nairobi — 1
  • Average Coloprice Score: Mombasa — 10/100 across 4 sites; Nairobi — 19/100 across 7 sites

Published for only one side: Published IT capacity.

Top facilities by score

Mombasa, Kenya

Nairobi, Kenya

Open Mombasa data centers →Open Nairobi data centers →Colocation pricing in Mombasa →Colocation pricing in Nairobi →