Coloprice Score · methodology 2026.08
Stockholm data centers: 33 facilities compared
33 facilities in Stockholm, Sweden are in the Coloprice catalog; their median Coloprice Score is 25 out of 100. The table ranks 25 of them by score — computed only from what each operator publishes and what we verified against primary sources.
Top 25 by Coloprice Score
Who is in this list: Every facility in the catalog located in Stockholm, Sweden — operational, under construction and announced. Status is visible in the maturity axis. Showing the top 25 of 33.
| # | Facility | Operator | MW | Score | Class | Axes |
|---|---|---|---|---|---|---|
| 1 | atNorth SWE01 Stockholm Metro Site (Kista) | atNorth | 12 | 43 | D | |
| 2 | STO2 | Digital Realty (Interxion) | — | 41 | D | |
| 3 | STO3 | Digital Realty (Interxion) | — | 41 | D | |
| 4 | STO1 | Digital Realty (Interxion) | — | 38 | D | |
| 5 | STO4 | Digital Realty (Interxion) | — | 38 | D | |
| 6 | STO5 | Digital Realty (Interxion) | — | 38 | D | |
| 7 | STO6 | Digital Realty (Interxion) | — | 38 | D | |
| 8 | Equinix SK1 | Equinix | — | 37 | D | |
| 9 | Equinix SK2 | Equinix | — | 37 | D | |
| 10 | Equinix SK3 | Equinix | — | 37 | D | |
| 11 | Conapto STHLM 4 South | Conapto | 28 | 33 | E | |
| 12 | GleSYS Stockholm (Vastberga) | GleSYS | 1 | 31 | E | |
| 13 | atNorth SWE02 Stockholm Metro Site (Akalla) | atNorth | 30 | 28 | E | |
| 14 | Conapto STHLM 2 South | Conapto | 4 | 28 | E | |
| 15 | Conapto STHLM 3 North | Conapto | 6 | 27 | E | |
| 16 | Bahnhof Thule | Bahnhof | 1.9 | 25 | E | |
| 17 | Conapto STHLM 1 City | Conapto | 1 | 25 | E | |
| 18 | Bahnhof Pionen | Bahnhof | 1.1 | 24 | E | |
| 19 | Bahnhof Gullan | Bahnhof | 0.55 | 23 | E | |
| 20 | STACK STO01 | STACK Infrastructure | 18 | 22 | limited data | |
| 21 | Bahnhof S:t Erik | Bahnhof | 0.5 | 22 | E | |
| 22 | City Hosting | City Hosting Sweden | — | 9 | limited data | |
| 23 | Digiplex Stockholm 1 | Colt | — | 9 | limited data | |
| 24 | GlobalConnect Hammarby | GlobalConnect Group | — | 9 | limited data | |
| 25 | GlobalConnect Sätra | GlobalConnect Group | — | 9 | limited data |
CC BY 4.0 · Coloprice data and compilation: free to reuse under CC BY 4.0 with attribution. Figures credited to third parties remain with their sources. License & attribution
Operators of facilities in this list can embed the award badge («Best data center in Stockholm, Sweden», «Top 10» …) free of charge — it is on the facility page under «Awards & badges» and links back here.
Select a Stockholm data center for your workload
The Stockholm catalog includes records for Digital Realty, Equinix, STACK, Bahnhof, Conapto, atNorth and other operators. Facility cards identify the actual address and published specifications. A Stockholm metro label may cover different municipalities; check the location before planning equipment deliveries or support visits.
Evaluate cooling and sustainability at the exact facility boundary. A renewable-energy statement, a heat-reuse project and a measured annual PUE describe different things. Request the reporting year, load conditions and applicable hall; do not treat a group-wide sustainability ambition as measured performance for the offered space.
For production or disaster recovery, compare application latency, independent routes, power topology, delivery dates and available density. Send identical commercial assumptions to each provider and compare energy, space, connectivity, support and escalation over the entire proposed term.
Stockholm data centers: 33 facilities compared FAQ
Which Stockholm data center should I choose?
Choose by the specific workload, address, connectivity, available power, cooling and resilience requirements. The evidence ranking supports a shortlist, not a universal best-provider recommendation.
Do renewable-energy claims prove low PUE?
No. Energy sourcing and PUE measure different things. Ask for measured PUE with its period, boundary and load conditions, separately from renewable-energy evidence.
How we ranked them
Coloprice Score is a 0–100 total of five axes: resilience (tier level weighted by the class of evidence, up to 35), compliance (independent audits, up to 20), transparency (how many of seven key fields are published, up to 20), scale (published MW on a log scale plus liquid cooling and AI readiness, up to 15) and maturity (status and age, up to 10). Every input is a field on the facility card, and every card cites its sources.
Nothing here is opinion or paid placement: an operator can only move up by publishing more data or citing more certificates. A dashed class means the operator disclosed too little for a class to be assigned honestly — the score is still computed. Full methodology, class thresholds and the top-50 across all countries: Coloprice Score rankings.
Explore further
Get quotes from these facilities
Tell us the market and capacity — we match your request with operators in this list and return real quotes. Free for buyers.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →