▮▮Coloprice

Metronode Perth 2 Data Centre, Stage 1

Operational

Metronode Perth 2 Data Centre, Stage 1 is a data center (Uptime Tier III, constructed facility certified) in Perth, Australia, operated by Metronode, currently operational.

Metronode Perth 2 Data Centre, Stage 1 is a Metronode data center in Perth, Australia, listed as a site in the Uptime Institute certification register.

Metronode Perth 2 Data Centre, Stage 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

5 of 14 fields published · Operator? Add or correct data →

Units
Operator
Metronode
City
Perth, Australia
Power, MW
—
Cooling
Air
Uptime Tier
III · constructed facility certified
Market benchmark
$188 per kW per month wholesale · Australia
Index rate for the market, not this operator’s price list
Uptime Institute Tier III Certification of Constructed Facility

1 sources · last checked 2026-10-04 · data pending on-site verification

E

Coloprice Score

31 out of 100

Class E · #48 of 168 in Australia

  • Resilience24/35
  • Compliance0/20
  • Transparency0/20
  • Scale0/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Metronode Perth 2 Data Centre, Stage 1 — Coloprice Score 31
<a href="https://coloprice.com/data-centers/australia/perth/metronode-perth-2-data-centre-stage-1/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/metronode-perth-2-data-centre-stage-1.svg"
    alt="Metronode Perth 2 Data Centre, Stage 1 — Coloprice Score 31" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Metronode Perth 2 Data Centre, Stage 1 — Top 10 data centers in Perth (Malaga), Australia 2026
#6 of 15 · See the list →

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Perth

FacilityOperatorPower, MWTierStatus
Metronode Perth 2 Data Centre, Stage 1Metronode—IIIOperational
NEXTDC P1 MalagaNEXTDC10IIIOperational
NEXTDC P2 Perth CBDNEXTDC20IVOperational
CDC Maddington CampusCDC Data Centres200—Announced
RCWA1 Data CentreFrontierDC—IIIOperational
Malaga Data CentreFujitsu—IVOperational

Source — Verified against operator sources · data pending on-site verification