11 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Pune: 11 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.122
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 1 AI-ready · 382+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Pune, India | · · · | $0.122 | 11 | — |
| United Arab Emirates | · · · | $0.110 | 54 | — |
| Singapore | $403 | $0.270 | 33 | — |
| United Kingdom | · · · | $0.442 | 81 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Pune, India?
No published wholesale $/kW benchmark exists for Pune, India yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 11 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Pune, India?
Commercial electricity in Pune, India is $0.122 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 11 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Pune, India?
On power alone, United Arab Emirates ($0.110/kWh) run below Pune, India. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Pune, India market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Iron Mountain PUN-1 | Iron Mountain | 1.6 | — | Operational |
| STT Pune 1 | ST Telemedia Global Data Centres (India) | 9 | 3 | Operational |
| STT Pune 2 | ST Telemedia Global Data Centres (India) | 15 | — | Operational |
| STT Pune 3 | ST Telemedia Global Data Centres (India) | 15 | — | Operational |
| STT Pune 4 | ST Telemedia Global Data Centres (India) | 18 | — | Operational |
| STT Pune 5 | ST Telemedia Global Data Centres (India) | 24 | — | Operational |
| AdaniConneX Pune | AdaniConneX | 250 | — | Announced |
| Nxtra Pune 1 (Kharadi) | Nxtra Data | 4.5 | — | Operational |
| Nxtra Pune 2 (Hinjewadi) | Nxtra Data | 17 | — | Operational |
| Nxtra Pune 3 (Hinjewadi) | Nxtra Data | 4 | — | Operational |
| Nxtra Pune 4 (Hinjewadi 2) | Nxtra Data | 24 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.