Data centers in Rome: 14 facilities, colocation pricing

Colocation pricing and providers in Rome →

How many data centers are in Rome?

Coloprice tracks 14 data centers in Rome, Italy: 14 operational, 0 under construction and 0 announced, run by 13 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.323

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 0 AI-ready · 6+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Rome, Italy· · ·$0.32314—
France$190$0.173186—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Rome?

Coloprice tracks 14 data centers in Rome, Italy: 14 operational, 0 under construction and 0 announced, run by 13 operators.

Which operators run data centers in Rome?

By number of facilities tracked: Unidata S.p.A. (2), Digital Realty (Interxion) (1), TIM Enterprise (Telecom Italia) (1), Irideos (Retelit) (1), Aruba S.p.A. (1).

What is the total data center power capacity in Rome?

Facilities that publish capacity add up to 6 MW (1 of 14 sites disclose a figure); the largest published site is Aruba IT4 Data Center A with 6 MW.

How much does colocation cost in Rome, Italy?

No published wholesale $/kW benchmark exists for Rome, Italy yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 14 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Rome, Italy?

Commercial electricity in Rome, Italy is $0.323 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 14 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Rome, Italy?

On power alone, France ($0.173/kWh), Germany ($0.269/kWh) run below Rome, Italy. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Rome, Italy market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Milan vs RomeRome vs Milan (Castelletto)Rome vs Turin

Data centers

FacilityOperatorPower, MWTierStatus
ROM1Digital Realty (Interxion)—IV*Operational
Acilia Data CenterTIM Enterprise (Telecom Italia)—IVOperational
Irideos Rome Data Center, Hall 2 and Hall 4Irideos (Retelit)—IVOperational
Aruba IT4 Data Center AAruba S.p.A.6—Operational
Mediterra ROM01 (ex Cloud Europe)Mediterra Data Centers——Operational
CDLAN E100CDLAN——Operational
Namex RomeNamex——Operational
WindColt——Operational
Telecom Italia Acilia Data Center, SA1-SA2-SA3-SA4Telecom Italia Sparkle—IVOperational
Cornelia (Rome)Unidata S.p.A.——Operational
Unidata IDC-GALERIAUnidata S.p.A.——Operational
Digital Realty ROM0 - RomeDigital Realty——Operational
Cloud EuropeCloud Europe s.r.l.——Operational
Fiber 23Fiber 23 S.R.L——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.