2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Santo Stefano Ticino: 2 facilities, colocation pricing
How many data centers are in Santo Stefano Ticino?
Coloprice tracks 2 data centers in Santo Stefano Ticino, Italy: 2 operational, 0 under construction and 0 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.323
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 10+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Santo Stefano Ticino (Milan), Italy | · · · | $0.323 | 2 | — |
| France | $190 | $0.173 | 187 | — |
| Germany | $250 | $0.269 | 274 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Santo Stefano Ticino?
Coloprice tracks 2 data centers in Santo Stefano Ticino, Italy: 2 operational, 0 under construction and 0 announced, run by 2 operators.
Which operators run data centers in Santo Stefano Ticino?
By number of facilities tracked: Polo Strategico Nazionale (1), Noovle (TIM Group) (1).
What is the total data center power capacity in Santo Stefano Ticino?
Facilities that publish capacity add up to 10 MW (1 of 2 sites disclose a figure); the largest published site is PSN Santo Stefano Ticino Data Center with 10 MW.
How much does colocation cost in Santo Stefano Ticino (Milan), Italy?
No published wholesale $/kW benchmark exists for Santo Stefano Ticino (Milan), Italy yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Santo Stefano Ticino (Milan), Italy?
Commercial electricity in Santo Stefano Ticino (Milan), Italy is $0.323 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Santo Stefano Ticino (Milan), Italy?
On power alone, France ($0.173/kWh), Germany ($0.269/kWh) run below Santo Stefano Ticino (Milan), Italy. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Santo Stefano Ticino (Milan), Italy market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| PSN Santo Stefano Ticino Data Center | Polo Strategico Nazionale | 10 | — | Operational |
| Noovle Santo Stefano Ticino Data Center, Building B, Data Hall Mercato | Noovle (TIM Group) | — | IV | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Italy
Colocation quotes in Santo Stefano Ticino: free, reply within one business day
Get Quotes →