▮▮Coloprice
← Italy

10 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Milan: 10 facilities, colocation pricing

Colocation pricing and providers in Milan →

How many data centers are in Milan?

Coloprice tracks 10 data centers in Milan, Italy: 9 operational, 0 under construction and 1 announced, run by 9 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.323

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 32+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Milan (Castelletto), Italy· · ·$0.32310—
France$190$0.173186—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Milan?

Coloprice tracks 10 data centers in Milan, Italy: 9 operational, 0 under construction and 1 announced, run by 9 operators.

Which operators run data centers in Milan?

By number of facilities tracked: Retelit (2), Vantage Data Centers (1), Vaultica (1), Servereasy (1), Templus Data Centers (1).

What is the total data center power capacity in Milan?

Facilities that publish capacity add up to 32 MW (1 of 10 sites disclose a figure); the largest published site is Vantage Milan II Campus with 32 MW.

How much does colocation cost in Milan (Castelletto), Italy?

No published wholesale $/kW benchmark exists for Milan (Castelletto), Italy yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 10 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Milan (Castelletto), Italy?

Commercial electricity in Milan (Castelletto), Italy is $0.323 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 10 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Milan (Castelletto), Italy?

On power alone, France ($0.173/kWh), Germany ($0.269/kWh) run below Milan (Castelletto), Italy. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Milan (Castelletto), Italy market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Milan vs Milan (Castelletto)Rome vs Milan (Castelletto)Milan (Castelletto) vs Turin

Data centers

FacilityOperatorPower, MWTierStatus
Vantage Milan II CampusVantage Data Centers32—Operational
Avalon 2 (Retelit)Retelit——Operational
Avalon 5 (Retelit, ex-BT Italia)Retelit—IV*Operational
Vaultica MIL03Vaultica——Announced
Servereasy DC1Servereasy——Operational
Templus Data Centres MilanTemplus Data Centers——Operational
Infracom PAL E / CDLANColt——Operational
WIIT MilanoWIIT S.p.A.——Operational
MIX DC CALDERAMIX s.r.l.——Operational
Seeweb Milano CalderaSeeweb Srl——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.