5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Zurich: 5 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.292
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 76+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Zurich, Switzerland | · · · | $0.292 | 5 | — |
| France | · · · | $0.185 | 53 | — |
| Italy | · · · | $0.323 | 24 | — |
| Germany | · · · | $0.283 | 90 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Zurich, Switzerland?
No published wholesale $/kW benchmark exists for Zurich, Switzerland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Zurich, Switzerland?
Commercial electricity in Zurich, Switzerland is $0.292 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Zurich, Switzerland?
On power alone, France ($0.185/kWh), Germany ($0.283/kWh) run below Zurich, Switzerland. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Zurich, Switzerland market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Equinix ZH2 | Equinix | — | — | Operational |
| Equinix ZH4 | Equinix | — | — | Operational |
| STACK ZUR01 | STACK Infrastructure | 10 | — | Operational |
| STACK ZUR02 | STACK Infrastructure | 36 | — | Operational |
| STACK ZUR03 | STACK Infrastructure | 30 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.