Freedom Cloud Data Center
Under constructionAlatau Special Economic Zone (Park of Innovative Technologies), Almaty, Kazakhstan
Freedom Cloud Data Center is a data center (Uptime Tier III, design certified) in Almaty, Kazakhstan, operated by Freedom Data Centers (Freedom Holding Corp.), with 7.2 MW of published IT capacity, currently under construction.
Under construction in Almaty's Alatau special economic zone since April 2025: 480 racks at up to 15 kW, 7.2 MW of IT load and 13 MW total site draw, on a KZT 175bn budget, with an Uptime Institute Tier III design certificate already issued.

- Operator
- Freedom Data Centers (Freedom Holding Corp.)
- City
- Almaty, Kazakhstan
- Power, MW
- 7.2 MW
- Cooling
- Air
- Uptime Tier
- III · design certified
- Racks
- 480
- Max density
- 15 kW/rack
Coloprice Score
40 out of 100
Class D · #5 of 9 in Kazakhstan
- Resilience16/35
- Compliance0/20
- Transparency12/20
- Scale9/15
- Maturity3/10
Freedom Holding Corp., the brokerage-turned-conglomerate led by Timur Turlov, broke ground on 21 April 2025 in the Alatau special economic zone (Park of Innovative Technologies) outside Almaty, with the digital development minister and a deputy akim of Almaty attending. The published design is 480 racks provisioned at up to 15 kW each, 7.2 MW of IT load and about 13 MW of total site consumption including cooling and support systems, on a 2.5-hectare plot. Construction is split into two stages of 240 racks. The budget is stated as KZT 75bn for construction plus KZT 100bn for equipment, KZT 175bn in total. The Uptime Institute register lists Freedom Cloud Almaty with Tier III Certification of Design Documents, and a sister site, Freedom Cloud Karaganda Stage 2, with the same award. Freedom says it already runs seven data centers in Kazakhstan and plans further capacity in Karaganda, Almaty and Astana. Two things make this project commercially interesting beyond its size: it signed a partnership with AWS in April 2025, unusual for a local operator in Central Asia, and the group frames the site as an alternative Europe-to-China data transit route through Kazakhstan rather than purely as domestic capacity.
- ▮Groundbreaking 21 April 2025 in the Alatau SEZ near Almaty
- ▮480 racks at up to 15 kW, 7.2 MW IT load, ~13 MW total site draw
- ▮Two build stages of 240 racks on a 2.5-hectare plot
- ▮Budget of KZT 175bn (KZT 75bn construction, KZT 100bn equipment)
- ▮Uptime Tier III design certificates for both the Almaty and Karaganda sites
Colocation pricing: Kazakhstan & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Almaty
Source — Verified against operator sources · data pending on-site verification