8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Almaty: 8 facilities, colocation pricing
Colocation pricing and providers in Almaty →
How many data centers are in Almaty?
Coloprice tracks 8 data centers in Almaty, Kazakhstan: 6 operational, 2 under construction and 0 announced, run by 8 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.090
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 5 Tier III/IV · 1 AI-ready · 10+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Almaty, Kazakhstan | · · · | $0.090 | 8 | — |
| Uzbekistan | · · · | $0.093 | 10 | — |
| Kyrgyzstan | · · · | $0.050 | 4 | — |
| Ukraine | · · · | $0.185 | 32 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Almaty?
Coloprice tracks 8 data centers in Almaty, Kazakhstan: 6 operational, 2 under construction and 0 announced, run by 8 operators.
Which operators run data centers in Almaty?
By number of facilities tracked: Kazteleport (Halyk Group) (1), Kaspi Cloud (1), Freedom Data Centers (Freedom Holding Corp.) (1), Beeline Kazakhstan (VEON) (1), ALLONS TELECOM (1).
What is the total data center power capacity in Almaty?
Facilities that publish capacity add up to 10 MW (3 of 8 sites disclose a figure); the largest published site is Freedom Cloud Data Center with 7.2 MW.
How much does colocation cost in Almaty, Kazakhstan?
No published wholesale $/kW benchmark exists for Almaty, Kazakhstan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Almaty, Kazakhstan?
Commercial electricity in Almaty, Kazakhstan is $0.090 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 2 of them announced or under construction.
Where is colocation cheaper near Almaty, Kazakhstan?
On power alone, Kyrgyzstan ($0.050/kWh) run below Almaty, Kazakhstan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Almaty, Kazakhstan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Sairam Data Center | Kazteleport (Halyk Group) | 2 | III | Operational |
| Data Center Alatau | Kaspi Cloud | — | III | Operational |
| Freedom Cloud Data Center | Freedom Data Centers (Freedom Holding Corp.) | 7.2 | III | Under construction |
| Hyper Cloud Data Center | Beeline Kazakhstan (VEON) | — | III* | Under construction |
| ALLONS TELECOM Data Center | ALLONS TELECOM | 1.26 | — | Operational |
| LLC Kaspi Cloud Data Center Alatau | LLC Kaspi Cloud | — | III | Operational |
| PS Internet Company DC | PS Cloud Services | — | — | Operational |
| Almaty TTC Data Center | JSC Transtelecom | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in Almaty: free, reply within one business day
Get Quotes →