4 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Almaty: 4 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.086
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 1 AI-ready · 9+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Almaty, Kazakhstan | · · · | $0.086 | 4 | — |
| Uzbekistan | · · · | $0.093 | 6 | — |
| Kyrgyzstan | · · · | $0.050 | 1 | — |
| Ukraine | · · · | $0.185 | 5 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Almaty, Kazakhstan?
No published wholesale $/kW benchmark exists for Almaty, Kazakhstan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Almaty, Kazakhstan?
Commercial electricity in Almaty, Kazakhstan is $0.086 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 4 facilities in our catalog, 2 of them announced or under construction.
Where is colocation cheaper near Almaty, Kazakhstan?
On power alone, Kyrgyzstan ($0.050/kWh) run below Almaty, Kazakhstan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Almaty, Kazakhstan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Sairam Data Center | Kazteleport (Halyk Group) | 2 | III | Operational |
| Data Center Alatau | Kaspi Cloud | — | III | Operational |
| Freedom Cloud Data Center | Freedom Data Centers (Freedom Holding Corp.) | 7.2 | III | Under construction |
| Hyper Cloud Data Center | Beeline Kazakhstan (VEON) | — | III* | Under construction |