Data centers in Bishkek: 1 facilities, colocation pricing

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.050

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 1+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Bishkek, Kyrgyzstan· · ·$0.0501
Kazakhstan· · ·$0.0869
Uzbekistan· · ·$0.0936
Armenia· · ·$0.1223

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How much does colocation cost in Bishkek, Kyrgyzstan?

No published wholesale $/kW benchmark exists for Bishkek, Kyrgyzstan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Bishkek, Kyrgyzstan?

Commercial electricity in Bishkek, Kyrgyzstan is $0.050 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Bishkek, Kyrgyzstan?

Bishkek, Kyrgyzstan sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Bishkek, Kyrgyzstan market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
Datatime Bishkek Data CenterDatatime LLC0.5IIIOperational