Equinix KL1
OperationalCyberjaya, Selangor, Malaysia
Equinix KL1 is a data center in Cyberjaya, Malaysia, operated by Equinix, currently operational, opened in 2024.
Equinix IBX in Cyberjaya opened in 2024, planned for 900 cabinets and 2,630 sqm of colocation space at full build-out, 100% covered by renewables.

- Operator
- Equinix
- City
- Cyberjaya, Malaysia
- Power, MW
- —
- Cooling
- Air
- Opened
- 2024
- Floor space
- 2,630 m²
- Racks
- 900
- Renewable energy
- 100%
Coloprice Score
23 out of 100
Class E · #28 of 64 in Malaysia
- Resilience0/35
- Compliance0/20
- Transparency13/20
- Scale0/15
- Maturity10/10
Connectivity: 4 networks and 1 internet exchanges are present in this facility. Source: PeeringDB →
KL1 brought the Equinix interconnection platform to the Klang Valley in early 2024, planted in Cyberjaya at the heart of Malaysia's Multimedia Super Corridor. The roughly US$100 million IBX opened its first phase in Q1 2024 with 450 cabinets over 1,300 sqm of colocation space; a second phase completed later the same year doubled the cabinet count, taking the facility toward its full design of 900 cabinets and 2,630 sqm. Equinix reports the site's electricity consumption is fully covered by renewables, consistent with the company's global 100% renewable coverage goal. As with its Johor twin JH1, the value here is ecosystem rather than raw megawatts: customers interconnect through Equinix Fabric, Cross Connects, Internet Exchange, and Metro Connect, reaching the operator's worldwide footprint and, since 2026, the newly announced KL2 rising less than a kilometre away. Early tenants span content, fintech, gaming, and AI companies. KL1 fits enterprises and service providers that need a carrier-dense point of presence for the Kuala Lumpur metro, particularly those pairing local deployments with capacity in Singapore or Johor.
- ▮Opened Q1 2024 in Cyberjaya, Multimedia Super Corridor
- ▮900 cabinets and 2,630 sqm of colocation space at full build
- ▮Phase 2 completed 2024, doubling initial 450 cabinets
- ▮Approximately US$100 million investment
- ▮Electricity consumption 100% covered by renewables
Colocation pricing: Malaysia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Cyberjaya
Source — Verified against operator sources · data pending on-site verification