▮▮Coloprice
← Malaysia

24 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Cyberjaya data centers: 24 facilities and 14 operators

Cyberjaya data center directory and buyer checklist

Coloprice tracks 24 Cyberjaya data center facilities from 14 operators. 18 are operational, 4 are under construction and 2 are announced. Sites that publish a capacity figure total approximately 788+ MW, but this includes future phases and should not be read as immediately available supply.

The directory covers AIMS Data Centre, Bridge Data Centres, EdgeConneX, Equinix, NTT Global Data Centers, Open DC, Vantage Data Centers and STT GDC Malaysia. Each facility record separates operating status, published capacity, Tier evidence, AI readiness and source history so buyers can build a defensible shortlist before requesting quotes.

For commercial comparison, send every provider the same requirement: committed IT load or rack count, density, redundancy, carrier and cloud access, compliance scope, target delivery date, term and expansion rights. Require recurring capacity, electricity, cross-connects, setup, remote hands and fit-out charges to be itemized rather than presented as one headline rate.

  • 2 tracked Cyberjaya facilities are currently marked AI-ready.
  • Confirm whether capacity is live, commissioned and allocated to the proposed hall.
  • Distinguish independently documented Tier evidence from operator claims.
  • Verify the certificate scope, facility address and contracted services before relying on compliance badges.
  • Normalize all quotes to the same committed kW, term and delivery schedule.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.135

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 6 Tier III/IV · 2 AI-ready · 788+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Cyberjaya, Malaysia· · ·$0.13524
Singapore$403$0.270498 ms
Indonesia· · ·$0.0638821 ms
Thailand· · ·$0.1284430 ms

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Cyberjaya is the mature end of the Malaysian market — the MSC-era cluster beside Kuala Lumpur, built for domestic enterprise rather than export hyperscale. The mix shows it: nine of twelve catalog facilities are already operational, and three carry Tier III or IV certification against none in Kulai and none in Johor Bahru. That tenant base — banks, government-linked companies and regional enterprises buying audited certified space in cabinets rather than campuses — makes pricing behave like a retail colocation market. Rate cards exist, increments are per-rack, and quotes move less on negotiation than the Johor campuses do. Regional reach serves the same buyers, at 21 ms to Jakarta, 30 ms to Bangkok and 59 ms to Mumbai. Expect asking rates above the bulk Johor level and below Singapore. If the requirement is certified space that can be occupied this year rather than a delivery date years out, this is the Malaysian cluster holding inventory.

Frequently asked questions

How many data centers are in Cyberjaya?

Coloprice currently tracks 24 data center facilities in Cyberjaya from 14 operators. 18 are operational, 4 are under construction and 2 are announced in the current dataset.

Which companies operate Cyberjaya data centers?

The current directory includes facilities associated with AIMS Data Centre, Bridge Data Centres, EdgeConneX, Equinix, NTT Global Data Centers, Open DC, Vantage Data Centers and STT GDC Malaysia.

How much data center capacity does Cyberjaya have?

Facilities that publish a capacity figure total approximately 788+ MW in the current Coloprice dataset. This includes operational, construction-stage and announced capacity, so buyers should verify the live MW and delivery date offered for a specific hall.

How should buyers compare Cyberjaya colocation quotes?

Use one requirement set for committed kW, density, redundancy, connectivity, compliance, delivery and term. Then compare recurring capacity, metered power, cross-connects, setup, remote hands, fit-out and escalation over the full contract period.

How much does colocation cost in Cyberjaya, Malaysia?

No published wholesale $/kW benchmark exists for Cyberjaya, Malaysia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 24 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Cyberjaya, Malaysia?

Commercial electricity in Cyberjaya, Malaysia is $0.135 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 24 facilities in our catalog, 6 of them announced or under construction.

Where is colocation cheaper near Cyberjaya, Malaysia?

On power alone, Indonesia ($0.063/kWh), Thailand ($0.128/kWh) run below Cyberjaya, Malaysia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Cyberjaya, Malaysia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
AIMS 200MW AI Data Centre CyberjayaAIMS Data Centre200Announced
AIMS Cyberjaya Block 1AIMS Data CentreIIIOperational
AIMS Cyberjaya Block 2AIMS Data Centre83Operational
AIMS Cyberjaya Block 3AIMS Data Centre12Operational
Bridge Data Centres MY01Bridge Data CentresOperational
EdgeConneX Cyberjaya CampusEdgeConneX200Announced
Equinix KL1EquinixOperational
NTT Cyberjaya 5 (CBJ5)NTT Global Data Centers6.5IIIOperational
NTT Cyberjaya 6 (CBJ6)NTT Global Data Centers7Operational
Open DC CJ1Open DCOperational
Vantage Cyberjaya I (KUL1) CampusVantage Data Centers31IIIOperational
Vantage Cyberjaya II CampusVantage Data Centers256Under construction
STT Kuala Lumpur 1STT GDC Malaysia (joint venture with Basis Bay)14Under construction
STT Cyberjaya DC.2STT GDC Malaysia (joint venture with Basis Bay)2.8Under construction
Bridge Data Centres MY02Bridge Data CentresOperational
CSF CX2CSF GroupOperational
CSF CX5CSF GroupOperational
Digital Realty KUL10Digital RealtyOperational
Digital Realty KUL11Digital RealtyOperational
Pi DC1Pi Data Centre (PiDC Holdings / Jakel Group)51IIIUnder construction
TM Global Klang Valley Data Centre (KVDC)TM Global (Telekom Malaysia)IIIOperational
Basis Bay Cyberjaya DC1Basis BayOperational
MyTelehaus CJ1 CentreMYTelehausOperational
NTT Cyberjaya 3 / 4 & AnnexNTT Global Data CentersOperational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.