▮▮Coloprice

32 facilities · 19 operators · 848 MW tracked

Colocation in Cyberjaya: pricing, providers and capacity

19 operators run 32 tracked data centers in Cyberjaya (25 operational, 848+ MW published, 3 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.

How much does colocation cost in Cyberjaya?

19 operators run 32 tracked data centers in Cyberjaya; the largest by sites is AIMS Data Centre (4). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. Published retail list prices in this market start at MYR 300 (1U colocation, iCore Technology). 3 operators publish rate cards here.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

  • MYR 381.15 — 1U rack mount, Exabytes Malaysia (Kuala Lumpur / Cyberjaya; 1 power point (kW not stated))
  • MYR 300 — 1U colocation, iCore Technology (Cyberjaya (CJ1); 100 W)
  • MYR 370 — 1U rack, GB Network Solutions (Cyberjaya (CJ1); 0.1 kW, 1 power point)

Retail rate cards: 1U to full rack

Colocation providers in Cyberjaya

Operators with tracked data centers in Cyberjaya, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
AIMS Data Centre4 / 3220AIMS Cyberjaya Block 2Uptime Tier III, ISO 27001, ISO 90012
NTT Global Data Centers4 / 414NTT Cyberjaya 5 (CBJ5)Uptime Tier III, ANSI/TIA-942-C Facility - Rated 3, ANSI/TIA-942-C Rated 3 (Constructed Facility)—
Vantage Data Centers3 / 2287Vantage Cyberjaya I (KUL1) CampusUptime Tier III, ISO 9001, ISO 27001—
STT GDC Malaysia (joint venture with Basis Bay)2 / 017STT Kuala Lumpur 1not published—
Basis Bay2 / 2not publishedBasis Bay Cyberjaya Data Centre 2ANSI/TIA-942-B Facility - Rated 3, ANSI/TIA-942-C Rated 4 (Constructed Facility)—
Bridge Data Centres2 / 2not publishedBridge Data Centres MY01PCI DSS, SOC 2—
CSF Group2 / 2not publishedCSF CX5not published—
Digital Realty2 / 2not publishedDigital Realty KUL10not published—
EdgeConneX1 / 0200EdgeConneX Cyberjaya Campusnot published—
Bitdeer AI (Bitdeer Technologies Group)1 / 060Bitdeer AI A103 (Cyberjaya Campus)not published1
Pi Data Centre (PiDC Holdings / Jakel Group)1 / 051Pi DC1Uptime Institute Tier III Certification of Design Documents—
Bank Negara Malaysia1 / 1not publishedBank Negara Malaysia Data Centre Cyberjaya (DCC)ANSI/TIA-942-B Rated 3 (Constructed Facility)—
Equinix1 / 1not publishedEquinix KL1not published—
Malaysian Communications & Multimedia Commission1 / 1not publishedMalaysian Communications & Multimedia Commission MCMC Data CentreUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility—
MYTelehaus1 / 1not publishedMyTelehaus CJ1 CentreANSI/TIA-942-A Facility - Rated 3—
Open DC1 / 1not publishedOpen DC CJ1ISO 27001, ISO 9001, PCI DSS—
PLTPRO Data Centre Sdn Bhd1 / 1not publishedPLTPRO Data Centrenot published—
Telekom Malaysia Berhad (TM)1 / 1not publishedTM ONE KVDC, Cyberjayanot published—
TM Global (Telekom Malaysia)1 / 1not publishedTM Global Klang Valley Data Centre (KVDC)Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility—

Availability in Cyberjaya: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Cyberjaya?

By tracked sites: AIMS Data Centre with 4. By published IT capacity: Vantage Data Centers with 287 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Cyberjaya, including some that do not sell space.

Is there colocation capacity available in Cyberjaya right now?

Coloprice tracks 32 facilities here (25 operational, 7 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Cyberjaya?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Cyberjaya

One brief, several operators with capacity in Cyberjaya, Malaysia, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.