24 facilities · 14 operators · 788 MW tracked
Colocation in Cyberjaya: pricing, providers and capacity
14 operators run 24 tracked data centers in Cyberjaya (18 operational, 788+ MW published, 2 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Cyberjaya?
14 operators run 24 tracked data centers in Cyberjaya; the largest by sites is AIMS Data Centre (4). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Cyberjaya publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Cyberjaya
Operators with tracked data centers in Cyberjaya, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| AIMS Data Centre | 4 / 3 | 220 | AIMS Cyberjaya Block 2 | Uptime Tier III, ISO 27001, ISO 9001 | 2 |
| NTT Global Data Centers | 3 / 3 | 14 | NTT Cyberjaya 5 (CBJ5) | Uptime Tier III, ANSI/TIA-942-C Facility - Rated 3 | — |
| Vantage Data Centers | 2 / 1 | 287 | Vantage Cyberjaya I (KUL1) Campus | Uptime Tier III, ISO 9001, ISO 27001 | — |
| STT GDC Malaysia (joint venture with Basis Bay) | 2 / 0 | 17 | STT Kuala Lumpur 1 | not published | — |
| Bridge Data Centres | 2 / 2 | not published | Bridge Data Centres MY01 | PCI DSS, SOC 2 | — |
| CSF Group | 2 / 2 | not published | CSF CX5 | not published | — |
| Digital Realty | 2 / 2 | not published | Digital Realty KUL10 | not published | — |
| EdgeConneX | 1 / 0 | 200 | EdgeConneX Cyberjaya Campus | not published | — |
| Pi Data Centre (PiDC Holdings / Jakel Group) | 1 / 0 | 51 | Pi DC1 | Uptime Institute Tier III Certification of Design Documents | — |
| Basis Bay | 1 / 1 | not published | Basis Bay Cyberjaya DC1 | ANSI/TIA-942-B Facility - Rated 3 | — |
| Equinix | 1 / 1 | not published | Equinix KL1 | not published | — |
| MYTelehaus | 1 / 1 | not published | MyTelehaus CJ1 Centre | ANSI/TIA-942-A Facility - Rated 3 | — |
| Open DC | 1 / 1 | not published | Open DC CJ1 | ISO 27001, ISO 9001, PCI DSS | — |
| TM Global (Telekom Malaysia) | 1 / 1 | not published | TM Global Klang Valley Data Centre (KVDC) | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
Availability in Cyberjaya: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Cyberjaya?
By tracked sites: AIMS Data Centre with 4. By published IT capacity: Vantage Data Centers with 287 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Cyberjaya, including some that do not sell space.
Is there colocation capacity available in Cyberjaya right now?
Coloprice tracks 24 facilities here (18 operational, 6 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Cyberjaya?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Cyberjaya
One brief, several operators with capacity in Cyberjaya, Malaysia, same terms. Independent — no operator pays for position.
Colocation in Cyberjaya? One brief, several quotes.