▮▮Coloprice

AirTrunk JHB3 & JHB4

Announced

Iskandar Puteri, Johor, Malaysia

AirTrunk JHB3 & JHB4 is a data center in Iskandar Puteri, Malaysia, operated by AirTrunk, with 280 MW of published IT capacity, announced, not yet built.

AirTrunk’s third and fourth Johor campuses, announced for Iskandar Puteri with a combined 280+ MW of IT load on a MYR12 billion (US$3 billion) investment, using 100% recycled water cooling.

AirTrunk JHB3 & JHB4 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · planned
Operator
AirTrunk
City
Iskandar Puteri, Malaysia
Power, MW
280 MW
Cooling
Air
AI-ready
Yes

Coloprice Score

19 out of 100

limited data · #27 of 41 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency6/20
  • Scale13/15
  • Maturity0/10
How the score is calculated →
Embed score badge
AirTrunk JHB3 & JHB4 — Coloprice Score 19
<a href="https://coloprice.com/data-centers/malaysia/iskandar-puteri/airtrunk-jhb3-jhb4-iskandar-puteri/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/airtrunk-jhb3-jhb4-iskandar-puteri.svg"
    alt="AirTrunk JHB3 & JHB4 — Coloprice Score 19" height="64">
</a>

AirTrunk announced JHB3 and JHB4 in August 2026 as the next phase of its Johor platform, sited in Iskandar Puteri close to its existing operational JHB1 and JHB2 campuses. The two new buildings add more than 280 MW of combined IT load on a MYR12 billion (roughly US$3 billion) investment, lifting AirTrunk's total committed capacity across its four Malaysian campuses past 700 MW and its cumulative Malaysia investment to about MYR27 billion (US$6.8 billion). AirTrunk positions the campuses for high-density cloud and AI workloads, pairing them with cooling systems designed to draw on 100% recycled water so the added load doesn't compete with local potable supply — a sensitivity regulators in Johor have flagged as the state's data center pipeline has grown. The operator also points to energy efficiency well below conventional data center benchmarks, though it has not published a target PUE for the new buildings. AirTrunk expects construction to support more than 3,000 jobs, with MYR423 million (about US$107 million) already committed to local suppliers and contractors as of the announcement. No opening date has been disclosed; the campuses join a fast-growing Johor cluster that includes Equinix, GDS, Bridge, Vantage, Princeton Digital Group and YTL facilities within a few kilometers.

  • JHB3 & JHB4 combined: 280+ MW IT load, announced August 2026
  • MYR12 billion (US$3 billion) investment for the two new campuses
  • Cooling systems use 100% recycled water
  • Lifts AirTrunk Malaysia total to 700+ MW across four campuses
  • Sited in Iskandar Puteri, adjacent to operational JHB1 and JHB2

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Iskandar Puteri

Source — Verified against operator sources · data pending on-site verification