Equinix JH2

Under construction

Equinix JH2 is a data center in Iskandar Puteri, Malaysia, operated by Equinix, currently under construction.

Equinix's second Johor data center, topped out in November 2025 in the Johor-Singapore Special Economic Zone with liquid cooling for AI workloads.

Equinix JH2 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Equinix
City
Iskandar Puteri, Malaysia
Power, MW
Cooling
Liquid
Racks
2,225
AI-ready
Yes

Coloprice Score

10 out of 100

limited data · #34 of 41 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency3/20
  • Scale4/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Equinix JH2 — Coloprice Score 10
<a href="https://coloprice.com/data-centers/malaysia/iskandar-puteri/equinix-jh2/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/equinix-jh2.svg"
    alt="Equinix JH2 — Coloprice Score 10" height="64">
</a>

JH2 is Equinix's second data center in Johor, Malaysia, under construction in the Johor-Singapore Special Economic Zone (JS-SEZ) as a sibling to the operator's first Malaysian site, JH1, in nearby Iskandar Puteri. Equinix marked the building topping out in November 2025, with an initial investment of about US$201 million. The facility is planned in two phases — roughly 1,100 racks scheduled for the first quarter of 2027 and a further 1,125 racks in the third quarter of 2027 — for a combined 2,225 cabinets at full build, with liquid cooling engineered in to support AI and HPC workloads that JH1's air-cooled retail suites were not designed for. No exact street address, floor area or power capacity has been published yet. Equinix has said JH2 will interconnect with JH1, the Kuala Lumpur sites KL1 and the announced KL2, and Singapore through Equinix Fabric, extending the operator's Singapore-adjacent cluster into Johor's new special economic zone.

  • Equinix's second Johor data center; topped out November 2025
  • Initial investment about US$201 million
  • 2,225 cabinets at full build across two 2027 phases
  • Liquid cooling engineered for AI and HPC workloads
  • Located in the Johor-Singapore Special Economic Zone (JS-SEZ)

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Iskandar Puteri

Source — Verified against operator sources · data pending on-site verification