8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Iskandar Puteri: 8 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.135
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 5 AI-ready · 750+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Iskandar Puteri, Malaysia | · · · | $0.135 | 8 | — |
| Singapore | $403 | $0.270 | 49 | — |
| Indonesia | · · · | $0.063 | 88 | — |
| Thailand | · · · | $0.128 | 44 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Iskandar Puteri, Malaysia?
No published wholesale $/kW benchmark exists for Iskandar Puteri, Malaysia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Iskandar Puteri, Malaysia?
Commercial electricity in Iskandar Puteri, Malaysia is $0.135 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 5 of them announced or under construction.
Where is colocation cheaper near Iskandar Puteri, Malaysia?
On power alone, Indonesia ($0.063/kWh), Thailand ($0.128/kWh) run below Iskandar Puteri, Malaysia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Iskandar Puteri, Malaysia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Equinix JH1 | Equinix | — | — | Operational |
| GDS Nusajaya Tech Park Data Center Campus | GDS Holdings | 54 | — | Operational |
| AirTrunk JHB3 & JHB4 | AirTrunk | 280 | — | Announced |
| Equinix JH2 | Equinix | — | — | Under construction |
| TM Nxera Data Centre Campus — Iskandar Puteri | TM Nxera (Telekom Malaysia / Nxera-Singtel JV) | 200 | — | Under construction |
| STT Johor 1 | STT GDC Malaysia (joint venture with Basis Bay) | 16 | — | Under construction |
| Empyrion MY1 Johor Data Centre Campus | Empyrion Digital | 200 | — | Under construction |
| TM ONE Iskandar Puteri Core Data Centre (IPDC) | TM ONE (Telekom Malaysia) | — | III | Operational |