GigaCenter
OperationalGigaCenter is a data center (Uptime Tier III, self-declared) in Kyiv, Ukraine, operated by GigaCenter (GIGAGROUP), with 1 MW of published IT capacity, currently operational, opened in 2014.
Carrier-dense 1,200 sqm Kyiv facility operating since April 2014 with a stated maximum load of 1 MW, up to 11 kW per rack, 4 MW of grid capacity from two transformer stations and 1.2 MW of diesel backup.

- Operator
- GigaCenter (GIGAGROUP)
- City
- Kyiv, Ukraine
- Power, MW
- 1 MW
- Cooling
- Air
- Uptime Tier
- III · self-declared
- Opened
- 2014
- Floor space
- 1,200 m²
- Max density
- 11 kW/rack
Coloprice Score
48 out of 100
Class D · #2 of 5 in Ukraine
- Resilience11/35
- Compliance11/20
- Transparency12/20
- Scale5/15
- Maturity9/10
GigaCenter is the colocation arm of the Kyiv telecom group GIGAGROUP and has been in service since 4 April 2014. The operator publishes a facility area of 1,200 sqm, a maximum power figure of 1 MW and a per-rack limit of 11 kW. Grid supply comes through two transformer stations with a combined capacity of 4 MW on two independent inputs from the city network, and three diesel generators rated at 1.2 MW in total cover a full loss of utility power. Cooling is handled by 14 external air-conditioning units with N+1 redundancy and humidity control, and fire protection combines a central control panel, detectors in every room and gas suppression. The general module holds 50 racks and colocation is sold from 1U through half racks (23U) and full racks (46U) up to individual and shielded modules; shielded space blocks radio signals and adds separate alarms and video monitoring. Connectivity is a core selling point: more than 12 carriers are present, with independent trunks to UA-IX and GIGANET and direct L1 switching to operators, delivered through two commutation rooms more than 20 metres apart. The operator states the infrastructure is built to TIER III requirements and TIA-942 and is recertified annually to ISO/IEC 27001 and PCI DSS; it also holds ISO 9001:2015 and a state attestation of conformity for the data center's information and communication system. SLA is 99.982% with financial compensation.
- ▮1,200 sqm in service since 4 April 2014; stated maximum power 1 MW, up to 11 kW per rack
- ▮Two transformer stations totalling 4 MW on two independent city inputs; three diesel generators totalling 1.2 MW
- ▮50 racks in the general module plus individual and shielded modules
- ▮12+ carriers with independent trunks to UA-IX and GIGANET; two commutation rooms 20+ m apart
- ▮14 external air-conditioning units, N+1 redundancy, gas fire suppression
Colocation pricing: Ukraine & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Kyiv
Source — Verified against operator sources · data pending on-site verification