2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Bukhara: 2 facilities, colocation pricing
How many data centers are in Bukhara?
Coloprice tracks 2 data centers in Bukhara, Uzbekistan: 1 operational, 1 under construction and 0 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.093
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 1+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Bukhara, Uzbekistan | · · · | $0.093 | 2 | — |
| Kazakhstan | · · · | $0.090 | 23 | — |
| Kyrgyzstan | · · · | $0.050 | 4 | — |
| Ukraine | · · · | $0.185 | 32 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Bukhara?
Coloprice tracks 2 data centers in Bukhara, Uzbekistan: 1 operational, 1 under construction and 0 announced, run by 2 operators.
Which operators run data centers in Bukhara?
By number of facilities tracked: Uzbektelecom (UzCloud) (1), Unitel LLC (Beeline Uzbekistan) (1).
What is the total data center power capacity in Bukhara?
Facilities that publish capacity add up to 1 MW (1 of 2 sites disclose a figure); the largest published site is UzCloud Bukhara Data Center (Uztelecom Cloud Hub Bukhara 1) with 0.8 MW.
How much does colocation cost in Bukhara, Uzbekistan?
No published wholesale $/kW benchmark exists for Bukhara, Uzbekistan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Bukhara, Uzbekistan?
Commercial electricity in Bukhara, Uzbekistan is $0.093 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Bukhara, Uzbekistan?
On power alone, Kazakhstan ($0.090/kWh), Kyrgyzstan ($0.050/kWh) run below Bukhara, Uzbekistan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Bukhara, Uzbekistan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| UzCloud Bukhara Data Center (Uztelecom Cloud Hub Bukhara 1) | Uzbektelecom (UzCloud) | 0.8 | III | Operational |
| Unitel Bukhara Regional Data Center 1 | Unitel LLC (Beeline Uzbekistan) | — | III | Under construction |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Uzbekistan
Colocation quotes in Bukhara: free, reply within one business day
Get Quotes →