How many data centers are in Tashkent?
Coloprice tracks 6 data centers in Tashkent, Uzbekistan: 5 operational, 1 under construction and 0 announced, run by 6 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.093
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 2 AI-ready · 14+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Tashkent, Uzbekistan | · · · | $0.093 | 6 | — |
| Kazakhstan | · · · | $0.090 | 23 | — |
| Kyrgyzstan | · · · | $0.050 | 4 | — |
| Ukraine | · · · | $0.185 | 32 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Tashkent?
Coloprice tracks 6 data centers in Tashkent, Uzbekistan: 5 operational, 1 under construction and 0 announced, run by 6 operators.
Which operators run data centers in Tashkent?
By number of facilities tracked: DataVolt (1), East Telecom (1), E-Government Project Management Center (1), Uzbektelecom (UzCloud) (1), UZINFOCOM (1).
What is the total data center power capacity in Tashkent?
Facilities that publish capacity add up to 14 MW (2 of 6 sites disclose a figure); the largest published site is DataVolt TAS-1 with 12 MW.
How much does colocation cost in Tashkent, Uzbekistan?
No published wholesale $/kW benchmark exists for Tashkent, Uzbekistan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 6 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Tashkent, Uzbekistan?
Commercial electricity in Tashkent, Uzbekistan is $0.093 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 6 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Tashkent, Uzbekistan?
On power alone, Kazakhstan ($0.090/kWh), Kyrgyzstan ($0.050/kWh) run below Tashkent, Uzbekistan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Tashkent, Uzbekistan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| DataVolt TAS-1 | DataVolt | 12 | III* | Under construction |
| East Telecom YA DC | East Telecom | — | III* | Operational |
| DC E-GOV Solnechniy (Unified E-Government Data Center) | E-Government Project Management Center | — | III | Operational |
| Uztelecom Cloud Hub Tashkent 1 | Uzbektelecom (UzCloud) | 1.8 | III | Operational |
| UZINFOCOM Data Center (DC-UZ) | UZINFOCOM | — | — | Operational |
| UZSCINET Data Center | UZSCINET | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Uzbekistan
Colocation quotes in Tashkent: free, reply within one business day
Get Quotes →