54 facilities · 26 operators · 170 MW tracked
Colocation in Chile: pricing, providers and markets
26 operators run 54 tracked data centers in Chile across 4 cities with at least three sites (50 operational, 170+ MW published, 0 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Chile?
26 operators run 54 tracked data centers in Chile; the largest by sites is GTD (8). There is no city-level benchmark for Chile; the closest published wholesale figure is Santiago at $200 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). Published retail list prices in this market start at CLP 100,000 (Housing 1U/2U tower, DCH (Dominios Chile)). 2 operators publish rate cards here.
Wholesale benchmark
$200 /kW·mo
Santiago · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026
Published retail prices
- CLP 159,900 — Housing 1U, Hosting.cl (Santiago; )
- CLP 100,000 — Housing 1U/2U tower, DCH (Dominios Chile) (Santiago; )
Colocation providers in Chile
Operators with tracked data centers in Chile, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| GTD | 8 / 8 | 8 | GTD Panamericana | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Gold Certification of Operational Sustainability | — |
| Scala Data Centers | 5 / 1 | 58 | Scala Curauma (SSCLCR01) | not published | — |
| Ascenty (Digital Realty) | 5 / 5 | 42 | Ascenty Santiago 2 | ISO 27001, PCI-DSS, SOC 1 Type II | — |
| Equinix | 4 / 4 | not published | Equinix ST2 IBX | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Gold Certification of Operational Sustainability | — |
| SONDA S.A. | 3 / 3 | 12 | DC SONDA Kudos | Uptime Institute Tier IV Gold Certification of Operational Sustainability, Uptime Institute Tier IV Certification of Design Documents, ISO 27001 | — |
| NextStream | 3 / 3 | 2 | Data Center Paine I | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability | — |
| Cirion Technologies | 2 / 2 | 24 | Cirion SAN1 (Santiago 1) | ISO 9001, ISO 27001, ISO 27017 | — |
| EdgeConneX | 2 / 2 | 21 | EdgeConneX SCL02 | not published | — |
| Aligned Data Centers | 2 / 2 | 3 | Aligned ST-01 (Lampa) | PCI DSS, ISO 27001, ISO 9001 | — |
| Claro Chile (América Móvil) | 2 / 2 | not published | Claro Chile Liray — Etapa B5 | Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility, Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| Entel Chile | 2 / 2 | not published | entel - CNT (torre entel) | not published | — |
| Grupo ZGH SpA | 2 / 2 | not published | Grupo ZGH - La Florida | not published | — |
| Coordinador Eléctrico Nacional | 1 / 1 | not published | Datacenter Principal Coordinador Eléctrico Nacional | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| EdgeUno | 1 / 1 | not published | EdgeUno Datacenter Santiago Chile (SCL1) | not published | — |
| es.lyntia | 1 / 1 | not published | Ufinet Chile Data Center Magnus II | not published | — |
| Ingeniería e Informática Asociada Ltda. (IIA) | 1 / 1 | not published | DC Porvenir (IIA) | Uptime Institute Tier III Certification of Design Documents | — |
| InterNexa | 1 / 1 | not published | Internexa Santiago de Chile | not published | — |
| MCL Internet | 1 / 1 | not published | Netglobalis | not published | — |
| PIT CHILE SPA | 1 / 1 | not published | IFX Santiago | not published | — |
| PowerHost IXMETRO | 1 / 1 | not published | PowerHost Santiago | not published | — |
| S&A Consultores Asociados Chile S.A. | 1 / 1 | not published | Data Center S&A Chile | Uptime Institute Tier III Certification, ISO 9001:2015, ISO/IEC 20000-1:2011 | — |
| Servicio de Salud del Maule | 1 / 1 | not published | Servicio de Salud del Maule Data Center Hospital de Curicó | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| Silica Networks | 1 / 1 | not published | Silica Networks - Data Center Nubicua (OSO01) | not published | — |
| Siptel Chile S.A. | 1 / 1 | not published | DC Siptel Balmoral I | Uptime Institute Tier III Certification of Design Documents | — |
| Telxius | 1 / 1 | not published | Telxius Valparaiso DC | not published | — |
| UFINET | 1 / 1 | not published | Magnus II | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
Colocation markets in Chile
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Santiago | 35 | 85 |
| Colocation in Huechuraba | 3 | 9 |
| Colocation in Lampa | 3 | 50 |
| Colocation in Valparaíso | 3 | 5 |
Availability in Chile: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Chile?
By tracked sites: GTD with 8. By published IT capacity: Scala Data Centers with 58 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Chile, including some that do not sell space.
Is there colocation capacity available in Chile right now?
Coloprice tracks 54 facilities here (50 operational, 4 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Chile?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Santiago benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Chile
One brief, several operators with capacity in Chile, same terms. Independent — no operator pays for position.
Colocation in Chile? One brief, several quotes.
Request quotes →