▮▮Coloprice

66 facilities · 22 operators · 258 MW tracked

Colocation in Netherlands: pricing, providers and markets

22 operators run 66 tracked data centers in Netherlands across 4 cities with at least three sites (63 operational, 258+ MW published, 6 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Netherlands?

22 operators run 66 tracked data centers in Netherlands; the largest by sites is NorthC (14). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. Published retail list prices in this market start at €500 (Half rack (23U), HOSTKEY). 2 operators publish rate cards here.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

  • €500 — Half rack (23U), HOSTKEY (Amsterdam (euNetworks); 3 kW (2 × 16 A PDU); electricity €0.50/kWh metered)
  • €800 — Full rack (48U), HOSTKEY (Amsterdam (euNetworks); 6 kW (2 × 32 A PDU); electricity €0.50/kWh metered)
  • €360 per kW per month — Per kW, unmanaged, MIRhosting (Amsterdam; per kW, all-in)
  • €410 per kW per month — Per kW, managed (popular), MIRhosting (Amsterdam; per kW, all-in)

Retail rate cards: 1U to full rack

Colocation providers in Netherlands

Operators with tracked data centers in Netherlands, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
NorthC14 / 1467NorthC AalsmeerISO 27001, ISO 9001, ISO 14001—
Digital Realty (Interxion)12 / 11not publishedDigital Realty AMS3ISO 27001, ISO 50001, SOC 2—
Equinix9 / 9not publishedEquinix AM1Climate Neutral Data Centre Pact, Cyber Essentials, EU Code of Conduct—
Kolo4 / 4not publishedKolo NL1 (Dronten)not published—
Previder4 / 4not publishedPrevider PDC1not published—
Switch Datacenters3 / 324Switch Datacenters AMS4Tier 3, Tier 3+, Tier III+3
QTS Data Centers2 / 241QTS Eemshaven Data Centernot published—
nLighten2 / 25nLighten Amsterdam II (AMS2)not published1
Keppel DC REIT2 / 2not publishedKeppel DC Amsterdamnot published—
KPN2 / 2not publishedDatacenter EindhovenUptime Institute Tier IV Certification of Constructed Facility, Uptime Institute Tier III Certification of Design Documents—
CyrusOne1 / 154CyrusOne AMS1ISO 14001—
NTT Global Data Centers1 / 121NTT Amsterdam 1 Data CenterISO 9001, ISO 22301, ISO 45001—
Colt DCS1 / 115Colt Rotterdam Data Centrenot published—
Iron Mountain1 / 113Iron Mountain AMS-1Tier III design, ISO 27001, ISO 50001—
Penta Infra1 / 08Penta Infra AMS01ISO 27001, ISO 9001, SOC 1 Type II1
maincubes1 / 15maincubes AMS01ISO 27001, ISO 9001, ISO 14001—
Serverfarm1 / 15Serverfarm AMS1not published—
Datacenter.com1 / 1not publishedDatacenter.com AMS1not published—
EdgeConneX1 / 1not publishedEdgeConneX AMS01PCI-DSS, SOC 2 Type 2, ISO 27001—
Global Switch1 / 1not publishedGlobal Switch AmsterdamISO 27001, ISO 9001, ISO 140011
phoenixNAP1 / 1not publishedphoenixNAP Amsterdam Data Centernot published—
Pure Data Centres Group1 / 0not publishedPure Data Centres — Amsterdam (Westpoort, AMS01)not published—

Colocation markets in Netherlands

Availability in Netherlands: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Netherlands?

By tracked sites: NorthC with 14. By published IT capacity: NorthC with 67 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Netherlands, including some that do not sell space.

Is there colocation capacity available in Netherlands right now?

Coloprice tracks 66 facilities here (63 operational, 3 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Netherlands?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Netherlands

One brief, several operators with capacity in Netherlands, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.