▮▮Coloprice

46 facilities · 15 operators · 565 MW tracked

Colocation in Philippines: pricing, providers and markets

15 operators run 46 tracked data centers in Philippines across 4 cities with at least three sites (39 operational, 565+ MW published, 10 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Philippines?

15 operators run 46 tracked data centers in Philippines; the largest by sites is STT GDC Philippines (9). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Philippines publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Philippines

Operators with tracked data centers in Philippines, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
STT GDC Philippines9 / 5242STT Fairview 1TIA-942 Rated 3, Uptime Tier III (design), Uptime Institute Tier III Certification of Design Documents4
ePLDT (VITRO Inc.)7 / 7117VITRO Santa RosaANSI/TIA-942-B Rated 3 (Constructed Facility), ANSI/TIA-942 Rated 3 Facilities Certification, TIA-942 Rated 32
Globe Telecom (GTI Corporation)7 / 7not publishedGlobe Data Center TG1 (Tiaong)not published—
VITRO5 / 5not publishedVITRO Sta. Rosa Data CenterANSI/TIA-942-B Rated 3 (Constructed Facility)—
Converge ICT Solutions Inc.4 / 412Converge ICT Angeles Data CenterUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility1
Equinix3 / 3not publishedEquinix MN2not published—
DITO Telecommunity2 / 1not publishedDITO Batangas Super Core Data CenterUptime Institute Tier III Certification of Design Documents—
Macrologic Diversified Technologies Inc.2 / 2not publishedMIaaS Data Centre (Macrologic Infrastructure as a Service)ANSI/TIA-942-B Facility - Rated 2, ANSI/TIA-942-B Rated 2 (Constructed Facility)—
PLDT / VITRO Inc.1 / 0100PLDT VITRO Cavite Data Centernot published1
SpaceDC1 / 172SpaceDC MNL1not published—
Digital Edge1 / 110Digital Edge NARRA1LEED Gold, BERDE, EDGE1
Digital Halo1 / 17Digital Halo MNL1not published1
A-FLOW (AyalaLand Logistics Holdings Corp. / FLOW Digital Infrastructure)1 / 16A-FLOW ML1not published—
VSTECS Philippines Inc.1 / 1not publishedVSTECS Philippines Data CenterANSI/TIA-942-B Facility - Rated 2—
YCO Cloud Centers1 / 0not publishedYCO Cloud Campus OneTIA-942 Rated 3 (design), ISO 22237 Availability 3 / Protection 3 (design)—

Colocation markets in Philippines

Availability in Philippines: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Philippines?

By tracked sites: STT GDC Philippines with 9. By published IT capacity: STT GDC Philippines with 242 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Philippines, including some that do not sell space.

Is there colocation capacity available in Philippines right now?

Coloprice tracks 46 facilities here (39 operational, 7 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Philippines?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Philippines

One brief, several operators with capacity in Philippines, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.